New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4671 Kipco Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2010
>
GJN4671 Kipco Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 12:49:43 PM
Creation date
5/18/2010 11:00:09 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004671
GL_Project_Number
905186
COE_Contract_Number
2010-00023
Retention_Destruction_Date
1/31/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
00495.80 Measurement <br />(DELETE) Entire First Paragraph <br />(ADD) The quantities of Trench Resurfacing will be measured on the unit basis per <br />00495.90. <br />00495.90 Payment. <br />(DELETE) Entire First Paragraph <br />(ADD) Trench Resurfacing shall be paid for according to 00745.90, 00756.90, and <br />00759.90 as applicable. <br />00756.60 Protection of Concrete <br />(DELETE) Entire First Paragraph <br />(ADD) Protect the concrete from traffic or other detrimental loading using temporary <br />steel plates with cold mix asphalt or HMAC ramps during non-work hours until <br />the pavement is opened to traffic. <br />00756.90 Payment <br />(ADD) Construction of concrete gutter will be paid under item (b). <br />00759.90 General <br />(ADD) Pay Item Unit of Measurement <br />(k) 6" Concrete Curb ................................:................Foot <br />(1) Concrete Sidewalk Ramps ....................................Each <br />(ADD) Item (1) includes payment for all work to construct concrete. sidewalk ramps <br />including excavation, aggregate base, concrete walk, variable height 4-inch <br />concrete curbs, truncated domes, and topsoil and seeding or mulch, to match <br />existing in areas adjacent to concrete ramps. <br />(ADD) Payment for installation,, maintenance, removal and cleanup of temporary <br />sidewalk access ramps is incidental. <br />Special Provisions - Job #4671 Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.