00495.80 Measurement <br />(DELETE) Entire First Paragraph <br />(ADD) The quantities of Trench Resurfacing will be measured on the unit basis per <br />00495.90. <br />00495.90 Payment. <br />(DELETE) Entire First Paragraph <br />(ADD) Trench Resurfacing shall be paid for according to 00745.90, 00756.90, and <br />00759.90 as applicable. <br />00756.60 Protection of Concrete <br />(DELETE) Entire First Paragraph <br />(ADD) Protect the concrete from traffic or other detrimental loading using temporary <br />steel plates with cold mix asphalt or HMAC ramps during non-work hours until <br />the pavement is opened to traffic. <br />00756.90 Payment <br />(ADD) Construction of concrete gutter will be paid under item (b). <br />00759.90 General <br />(ADD) Pay Item Unit of Measurement <br />(k) 6" Concrete Curb ................................:................Foot <br />(1) Concrete Sidewalk Ramps ....................................Each <br />(ADD) Item (1) includes payment for all work to construct concrete. sidewalk ramps <br />including excavation, aggregate base, concrete walk, variable height 4-inch <br />concrete curbs, truncated domes, and topsoil and seeding or mulch, to match <br />existing in areas adjacent to concrete ramps. <br />(ADD) Payment for installation,, maintenance, removal and cleanup of temporary <br />sidewalk access ramps is incidental. <br />Special Provisions - Job #4671 Page 7 <br />