Run Date: 05/12/2010 10:14:09 <br />Contractor: WILDISH CONST. <br />Job 93-004529 <br />Contract No: 2009-00025 <br />PO 2009100411 <br />Assessable: No <br />Line Description Last Chng Or <br />City of Eugene <br />Contract Preliminary Progress Payment <br />Payment No : 004 Final Pay <br />Original Contract: $789,585.00 <br />Current Amount: $835,615.09 <br />Contract Award Date: 06/15/2009 <br />Completion Date: 10/09/2009 <br />Current Contract <br />Unit Price Unit Measure Quantity <br />Estimated Payment Cumulative Totals <br />Amount Quantity Amount Quantit' <br />Page 4 <br />96 Complete <br />0370 <br />CONCRETE WASTEWATER MANHOLES, <br />$8,500.00 <br />EACH <br />1.000 <br />$8,500.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0371 <br />6TH/HIGH CORE & EXPLORATION (J <br />004 <br />$4,010.33 <br />LUMPSUM <br />1.000 <br />$4,010.33 <br />1.000 <br />$4,010.33 <br />1.000 <br />$4,010.33 <br />100.00 <br />0372 <br />6TH/HIGH SD & WW WORK (JOB #45 <br />004 <br />$15,459.46 <br />LUMPSUM <br />1.000 <br />$15,459.46 <br />1.000 <br />$15,459.46 <br />1.000 <br />$15,459.46 <br />100.00 <br />0380 <br />CONCRETE WASTEWATER MANHOLES <br />$3,000.00 <br />EACH <br />1.000 <br />$3,000.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0390 <br />CONCRETE WASTEWATER MANHOLES, <br />$5,000.00 <br />EACH <br />1.000 <br />$5,000.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0400 <br />12 INCH, DI WW PIPE, CARRY THR <br />$280.00 <br />FOOT <br />12.000 <br />$3,360.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0410 <br />FILLING ABANDONED PIPES <br />$25.00 <br />FOOT <br />24.000 <br />$600.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0420 <br />REMOVE WW HANGER PIPE AND MOUN <br />$13.00 <br />FOOT <br />414.000 <br />$5,382.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0430 <br />REMOVE WW COLLECTION BOX <br />$2,400.00 <br />LUMPSUM <br />1.000 <br />$2,400.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0440 <br />12 INCH PVC WW PIPE <br />$200.00 <br />FOOT <br />411.000 <br />$82,200.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0450 <br />ASPHALT CONCRETE PAVEMENT REPA <br />$80.00 <br />CUYD <br />110.000 <br />$8,800.00 <br />0.000 <br />$0.00 <br />107.900 <br />$8,632.00 <br />98.00 <br />0460 <br />PAVEMENT REMOVAL <br />$4.00 <br />SQFT <br />430.000 <br />$1,720.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0470 <br />CONCRETE GRINDING <br />$10.00 <br />SQFT <br />60.000 <br />$600.00 <br />0.000 <br />$0.00 <br />33.400 <br />$334.00 <br />56.00 <br />0471 <br />ADA RAMP CONCRETE GRINDING(JOB <br />004 <br />$6,818.81 <br />LUMPSUM <br />1.000 <br />$6,818.81 <br />1.000 <br />$6,818.81 <br />1.000 <br />$6,818.81 <br />100.00 <br />0480 <br />COLD PLANE PVMT REMOVAL, 2" DE <br />$0.10 <br />SQFT <br />225,000.000 <br />$22,500.00 <br />0.000 <br />$0.00 <br />235,250.000 <br />$23,525.00 <br />105.00 <br />0490 <br />COLD PLANE PVMT REMOVAL, 4" DE <br />$0.10 <br />SQFT <br />36,500.000 <br />$3,650.00 <br />0.000 <br />$0.00 <br />37,044.000 <br />$3,704.40 <br />101.00 <br />0500 <br />LEVEL 3, 1/2" DENSE HMAC <br />$51.00 <br />TON <br />4,250.000 <br />$216,750.00 <br />0.000 <br />$0.00 <br />3,906.550 <br />$199,234.05 M <br />92.00 <br />0501 <br />EXTRA WARM MIX ASPHALT(JOB 452 <br />001 <br />$2.50 <br />TON <br />4,250.000 <br />$10,625.00 <br />0.000 <br />$0.00 <br />3,906.550 <br />$9,766.38 <br />92.00 <br />0502 <br />WMAC DE-ESCALTION ADJ-SEPT (JO <br />002 <br />($2.13) <br />TON <br />3,672.120 <br />($7,821.62) <br />3,672.120 <br />($7,821.62) <br />3,672.120 <br />($7,821.62) <br />100.00 <br />0510 <br />CONCRETE CURBS <br />$23.00 <br />FOOT <br />43.000 <br />$989.00 <br />0.000 <br />$0.00 <br />251.200 <br />$5,777.60 <br />584.00 <br />0520 <br />CONCRETE CURB AND GUTTER <br />$34.00 <br />FOOT <br />135.000 <br />$4,590.00 <br />0.000 <br />$0.00 <br />53.300 <br />$1,812.20 <br />39 00 <br />0530 <br />STANDARD CONCRETE GUTTER <br />$30.00 <br />FOOT <br />6.000 <br />$180.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0540 <br />CONCRETE WALKS <br />$7.00 <br />SQFT <br />1,620.000 <br />$11,340.00 <br />0.000 <br />$0.00 <br />1,516.100 <br />$10,612.70 <br />94.00 <br />0550 <br />CONCRETE DRIVEWAYS, 7 INCH THI <br />$11.00 <br />SQFT <br />100.000 <br />$1,300.00 <br />0.000 <br />$0.00 <br />177.364 <br />$2,305.73 <br />177.00 <br />Amount <br />