Run Date: 05/11/2010 12:16:55 Page 6 <br />City of Eugene <br />Contract Preliminary Progress Payment <br />Payment No : 005 Final Pay <br />Contractor: WILDISH CONSTRUCTION Original Contract: $878,656.55 <br />Job 93-004561 Current Amount: $894,292.88 <br />Contract No: 2009-00026 Contract Award Date: 06/15/2009 <br />PO 2009100420 Completion Date: 10/02/2009 <br />Assessable: No <br />Current Contract Estimated Payment Cumulative Totals % Complete <br />Line Description Last Chng Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount <br />0800 <br />MH REM/REPL FRAME/COVER-STM <br />$259.00 <br />EACH <br />2.000 <br />$518.00 <br />0.000 <br />$0.00 <br />2.000 <br />$518.00 <br />100.00 <br />0810 <br />PLUG PIPE, 12-INCH <br />$150.00 <br />EACH <br />1.000 <br />$150.00 <br />0.000 <br />$0.00 <br />1.000 <br />$150.00 <br />100.00 <br />0820 <br />ASPHALT CONCRETE PAVEMENT REPA <br />$85.00 <br />CUYD <br />135.000 <br />$11,475.00 <br />0.000 <br />$0.00 <br />236.320 <br />$20,087.20 <br />175.00 <br />0830 <br />COLD PLANE PVMT REMOVAL, 2" DE <br />$0.10 <br />SQFT <br />125,000.000 <br />$12,500.00 <br />0.000 <br />$0.00 <br />92,257.900 <br />$9,225.79 <br />74.00 <br />0840 <br />LEVEL 3, 1/2" DENSE WMAC <br />$49.00 <br />TON <br />2,300.000 <br />$112,700.00 <br />0.000 <br />$0.00 <br />1,704 840 <br />$83,537.16 M <br />74.00 <br />0841 <br />WMAC DE-ESCALATION ADJ-SEPT (J 001 <br />($2.36) <br />TON <br />1,617.280 <br />($3,816.78) <br />1,617,280 <br />($3,816.78) <br />1,617.280 <br />($3,816.78) <br />100.00 <br />0850 <br />CONCRETE CURBS, STANDARD <br />$90.00 <br />FOOT <br />6.000 <br />$540.00 <br />0.000 <br />$0.00 <br />7.000 <br />$630.00 <br />117.00 <br />0860 <br />CONCRETE CURB AND GUTTER <br />$70.00 <br />FOOT <br />20.000 <br />$1,400.00 <br />0.000 <br />$0.00 <br />12.200 <br />$854.00 <br />61.00 <br />0870 <br />PVMT LEGEND, TYPE A2: ARROWS <br />$160.00 <br />EACH <br />4.000 <br />$640.00 <br />0.000 <br />$0.00 <br />6.000 <br />$960.00 <br />150.00 <br />0880 <br />PVMT LEGEND, TYPE A2: RR CROSS <br />$900.00 <br />EACH <br />5.000 <br />$4,500.00 <br />0.000 <br />$0.00 <br />2.000 <br />$1,800.00 <br />40.00 <br />0890 <br />PVMT LEGEND, TYPE A2: "STOP" <br />$200.00 <br />EACH <br />4.000 <br />$800.00 <br />0.000 <br />$0.00 <br />4.000 <br />$800.00 <br />100.00 <br />0900 <br />PVMT LINE, TYPE A2 OR B <br />$7.00 <br />SQFT <br />184.000 <br />$1,288.00 <br />0.000 <br />$0.00 <br />157.000 <br />$1,099.00 <br />85.00 <br />0910 <br />MONO-DIRECTIONAL CRYSTAL TYPE <br />$5.00 <br />EACH <br />15.000 <br />$75.00 <br />0.000 <br />$0.00 <br />15.000 <br />$75.00 <br />100.00 <br />0920 <br />BI-DIRECTIONAL YELLOW TYPE I M <br />$5.00 <br />EACH <br />70.000 <br />$350.00 <br />0.000 <br />$0.00 <br />72.000 <br />$360.00 <br />103.00 <br />0930 <br />THERMOPLASTIC, NON-PROFILE, 90 <br />$4,000.00 <br />LUMPSUM <br />1.000 <br />$4,000.00 <br />0.000 <br />$0.00 <br />1.000 <br />$4,000.00 <br />100.00 <br />0940 <br />LOOP DETECTORS INSTALLATION <br />$454.00 <br />EACH <br />6.000 <br />$2,724.00 <br />0.000 <br />$0.00 <br />6.000 <br />$2,724.00 <br />100.00 <br />0950 <br />WW WORK NEAR MH #4877 (JOB #45 002 <br />$11,419.61 <br />LUMPSUM <br />1.000 <br />$11,419.61 <br />1.000 <br />$11,419.61 <br />1.000 <br />$11,419.61 <br />100.00 <br />$200,906.56 <br />$8,328.56 <br />$173,254.71 <br />