Eng:ineeririg and Construcfioin Agrdetnen# <br />CO-OWNER'S SIGNATURE <br />Job L 1 Contract # Capitai Project # <br />The undersignied Owner requests the Public ImproVements as: de'sotlbed. below: <br />Public VlCorks <br />Engineering <br />City Off ugene <br />99 E. Broadway, Suite 400. <br />Eugene, Oregon 9,7401 <br />(541;}82-5231 <br />(541) fi82=5032 FAX <br />Type of Improvement: _P_aving and Stormwater <br />(Paving, wastewater. stormwater,.street fight# <br />Looatiow- 15ih Avenue UO Arena PEP1.2- (15~'Avenue - Villarti St Orchard St, and -Walnut^St intersection Improyeme its) <br />(Street or easement. lf'a subdivision, print subdivls ilnnante), <br />North (or east) limit: 125 eet eastof.Walnut Street . $outh (or west) limit: 75 feet:west of Villard Street . <br />(EXWpt W subdivislons) (Except for subdivisions) <br />be desighed and constructed during, the 201 Q of subseq.uebt construction season in the following manner (check one): <br />(Year) <br />1'.. As a Ci.ty'enginearari.and constructed project (:011gibi;e for asse'ssmentfinancing). <br />City;agrees: <br />a) to perform. engineering design, oost estimate, award of, Contra. t, construdtidri'inspedtlon, and assessr+ient tatiuiat+9n for the <br />improvements; <br />b) to participate.in the:cost of necessary additional: capacity of improvements beyond the assessable •amounts -as stipulated in <br />the Eugene Muni'cipal:Code. <br />Owner agrees: <br />a) to pay all engineering and construction costs which are not eligible for assessment: financing. <br />b), if the undersigned owner :ohooses to discontinue the.City engineering and,construction: process prior to execution of a <br />construction contract; the owner further agrees to pay'altengineedng:and other project-related.c'osts incurred by the City to <br />thatpoint, and to comply -with.paragraph 2 below, If applicable. <br />As a privatelyengineered: and constructed prof::actwlth private.financing arranged byti e. Owner. <br />Owner agrees: <br />a) to install al[reiluired public improvements at no cost to fhe City;; <br />b:) to pay actual City costs incurred' for plan review and processing, inspection, materials testing, and other engineering <br />services, all. of which will tie billed and payable monthly with final payment due prior W City's final ai:ceptance of the <br />completed: improvements. <br />c) to provide the City a bond, which includes a one-year warranty period in an amount suffipierif:to.cover all engineering and <br />construction costs associated with completion of the required: public improvements,, <br />d;) to pay Other char, and lev eS•for pgbfic Improvements, if required. Other charges may include but are not limited to <br />1;) penalty charges: in the event theproperty owner fails to make poymOot when Mite under this agreement, the property <br />ownershaif be charged a penaltyin the amount of $25 or ten percerit.(1t1"/°) of the past dine amount, whichever is <br />greater. Payment of the penalty shall not constitute a waiver by the City pf its other remedies, <br />2) interesl charges: property owner 5haff pay interest on all past due amounts at the rate of eighteen purcent (181`14 per <br />annuf(i.frorn the due date until paid. This sum shall be in addition to. penalty charges;. <br />PROPERTY OWNER CO-OVVNER CITY OF EUGENE <br />PROPERTY OWNER'S NAME <br />DATE <br />ADDRESS <br />kJ," , iN== 47b?~ <br />CITY /STTATE, I ZIP <br />~C C - 3-.6 ZZu cam- <br />PfiQNE CtUMBER (business, hours) <br />CO-OWNER'S NAME <br />{SATE <br />T:IT.LE. <br />'S: -tom <br />ORTE= <br />ADDRESS <br />CITY i STATE f ZIP <br />101 E BROADWAY,. SUITE 400 <br />Eu.0,ENe OREGON f)1 <br />Original to tnf~ City of Eugene <br />PHONE NUMBER (business hours) Conies to Owner, Co- i-, rer, and Inspector -I <br />