Lane County <br />Report ID: LBILL001 BILLABLE PROJECT COSTS Page No. 1 <br />Run Date 04/30/2010 <br />Run Time 14:44:52 <br />Billable Project Costs for Fiscal Period 2010-03 Period begins 03/01/2010 and ends including 03/31/2010 <br />Project: 36644019 Sylvan/Floral Hill FDR (4673) Overhead Rates Applied for this project: Operational (Where applicable) <br />Billed By: 3636213 Materials Testing Proi: 36644019 <br />P4065-Material investigation <br />TranDate <br />TranID <br />Resource Employed <br />Qty <br />'y mount <br />Overhead <br />Transaction Remark <br />03/05/2010 <br />EQUIPMENT <br />2008 FORD 4X4 REG CAB PICK UP <br />6 <br />J $17.52 <br />03/05/2010 <br />EQUIPMENT <br />2009 FORD ECONOLINE 12 Passeng <br />6 <br />V $14.94 <br />' <br />1 <br />03/05/2010 <br />LABOR <br />Engineering Technician 2 <br />6 <br />$148.38 <br />' <br />$182.82 <br />SAMPLE COLLECTING <br />03/05/2010 <br />LABOR <br />Engineering Technician 3 <br />6 <br />°x$146.70 <br />` <br />$180.75 <br />SAMPLING FOR FDR <br />03/05/2010 <br />LABOR <br />Sr Engineering Associate <br />6 <br />$168.72 <br />$207.88 <br />SOIL SAMPLING <br />P4065 Totals <br />$ 496.26 <br />$ 571.45 <br />$ 1067.71 <br />P4070-Common soils sampling -testing <br />TranDate <br />TmnID <br />Resource Employed <br />Qty <br />Amount <br />Overhead <br />Transaction Remark <br />03/08/2010 <br />LABOR <br />Engineering Technician 3 <br />6 <br />V $146.70 <br />$180.75 <br />SOIL, AGG,AC PREP FOR FDR <br />P4070 Totals <br />$ 146.70 <br />$ 180.75 <br />$ 327.45 <br />P4135-Mix design <br />TranDate <br />TranID <br />Resource Employed <br />Qty <br />Amount <br />Overhead <br />Transaction Remark <br />03/11/2010 <br />LABOR <br />Sr Engineering Associate <br />4 <br />V$112.48 <br />$138.59 <br />MIX DESIGN FOR CTB <br />03/12/2010 <br />LABOR <br />Sr Engineering Associate <br />2 <br />V $56.24 <br />$69.29 <br />MIX DESIGN FOR CTB <br />03/15/2010 <br />LABOR <br />Sr Engineering Associate <br />2 <br />V$56.24 <br />$69.29 <br />CTB DESIGN <br />03/16/2010 <br />LABOR <br />Sr Engineering Associate <br />1 <br />6$28.12 <br />$34.65 <br />CTB DESIGN <br />03/18/2010 <br />LABOR <br />Sr Engineering Associate <br />1.5 <br />)$42.18 <br />$51.97 <br />CTB DESIGN <br />03/19/2010 <br />LABOR <br />Sr Engineering Associate <br />1 <br />V $28.12 <br />$34.65 <br />CTB DESIGN <br />P4135 Totals <br />$ 323.38 <br />$ 398.44 <br />$ 721.82 <br />O <br />N <br />3636213 Materials Testing Total $ 2116.98 <br />36644019 Project Grand Total $ 2116.98 <br />