New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4707 Eng Const Agreement
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2010
>
GJN4707 Eng Const Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2012 4:12:21 PM
Creation date
5/10/2010 11:23:57 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004707
GL_Project_Number
374707
COE_Contract_Number
2011-00506
Retention_Destruction_Date
5/25/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Engitieering'and OOnstruCtibn Agreement Public Works <br />Engineenng <br />Location I e Avenue; UO Arena PEPI i (1.5P Avenue VIllard St i Orchard t and Wafnut SE intersection imnr3vaments) <br />(Street or easement lla.subtl1*1-,, PdOsubOWSIon:oarrte). <br />'NGrth for:east) limit 126 feet .east:bf.Walnut Street . South.(qr west)tirniit: 75 feet:west:of 1/iilard Street . <br />(Exdept:forsubdMsbns) (Except forsUbdMelons) <br />ire iiesigned and constructed during the 01U or supseque'nt eonstruetibn season in the following mennet(check one): <br />(Year) <br />Asa, City enginearetl;and oonstrtrcted project (d1].gibiefor. assessment nanOng).. <br />Gify:agraes: <br />a) to perform .ertgfaeeiJi 9 design, cost estimate, award of i*ntract, condrkiddon Inspection, and, assessrrienf fatiuiatipn .for the <br />improvements" <br />b) to participate,in-:ahe..costof necessary-addlUonakppacity of mprovements beyond.-tlie-essessable amounts es stipulated in <br />the Eugene Munidpal Code. <br />Q' n de agrees; <br />a) to pay all engineering. and construction <br />b) if the undersigned owner. chooses to. dt <br />construction contract; the owner further., <br />that.point,:aAdta Gomply.with paragrap <br />to execution of a <br />;acted bythe:City to <br />.2, A~a privatetyeng,,inserad.and.coiistructed profectvitittt ptiitate finaniCing`arranged.;by'iti0 Oyvne>r. <br />Owner agrees:. <br />a) ..to Install aerequired public improvements at no costtothe City;: <br />b) to pa_y actual .City costs incurred foe plan review and ' ro-Bssing, trrsper tiaq; .trtateifals testing'. and ot. ee engineering <br />.services, all. of Which v~iili: be billed and payableim.Wnttily witty final payM'bnt duel pfibr .(o City-s final. atx;eptance of the <br />comRleted,impupvemertts. <br />o) to provide the Cliy.a bond, which includes a oneyoarwarranty period; in an amount:sufficietit:to,cbver all engineering.and <br />.construction:costs assdciatedwith completion W -4ho7ret(ulredpublic improvemerits. <br />d:). to pay other cha eis.anid levies.forput2llc iniprakeraonls, if..required. Oftrcbarges my'tndude; but-are not.11m1ted1b: <br />1) pertettyctiarggs to:fhe.a3venbttie property.Q (n r fates to makp paymeritxVlten di".. urtder.ttiis agreententr.d a Praperty <br />yina <br />shall <br />PROPERTY OWNER:S'f4AME <br />. Ll /!D <br />GATE <br />ADDRESS <br />02- 4? b <br />C"10TAT.F MP <br />/1-.3 Z228Z. <br />Pf4QNE,NUMSER Ytwsin U hours}: <br />the <br />CO- NEWS WE <br />T1AT4 <br />ADDRESS <br />'CITYZSTATEIZIP <br />PRONE N UMBEL. (busines;'t~.iars) <br />TITLE..' . <br />101 It (B ROA1.WNW, _ U(:'i'i 400 <br />MGEgE bhbE d "Mil <br />2) interes eltarges:..pmperty.oWner stiaitpay:ihterest;on al past due'amoun(s at`.tha rate of eldhteen percent:(1.8%): per <br />•annurit from' the due date until paid. Tliii•surh shall lid (n".-A&RIon tW Onalttl.dSarDe9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.