New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4582 Eugene Sand Gravel
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2010
>
GJN4582 Eugene Sand Gravel
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 11:33:16 AM
Creation date
5/7/2010 10:24:56 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004582
GL_Project_Number
995344
COE_Contract_Number
2010-00019
Retention_Destruction_Date
8/12/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
03/29/2010 11:15 FAX 541 682 8410 CITY EUGENE PW ENG EUGENE SAND IM002/002 <br />0 <br />Public Works <br />Engineering <br />City of Eugene <br />99 East Broadway, Suite 400 <br />Eugene, Oregon 97401 <br />(541) 682-5560 <br />(541) 682-8410 FAX <br />ADDENDUM NO. 1 <br />TO Tl-IE CONTRACT DOCUMENTS AND SPECIFICATIONS FOR <br />P -k l'RIENT 130N11 MEASURE OAT WILLA MET'TF STREET FROM 46 rif :'I,N IJF rI O -52N" AVENUE <br />MARCH 29, 2010 JOIE #4582 <br />TO ALL .PLANHOLIDERS: <br />BID NUMBER 5 <br />T-he following changes shall amend and supplement the project bidding documents only to the extent specifically <br />shown and noted. AH other conditions shall remain the same <br />Bidders shall incorporate- the effects of these changes in the appropriate bid items included in this addendum and <br />the total of these bid items then add in the appropriate place on tine bid form. <br />CHANGES TO SPECIAL PROVISIONS: <br />00745.90 General <br />(ADD) in order to provide a means to adjust asphalt cement price. if needed, the fraction of tile WMAC <br />per ton unit price which is represented by the asphalt cement in mixture shall be designated on the <br />bid schedule. Each WMAC pay item shall have the cost for the fraction of the \WMAC per ton unit <br />price represented by the asphalt cement in mixture designated on the bid schedule, beneath the pay <br />item, on the line identified as "Asphalt Cement in WlIVIAC per Ton of \WMAC Complete". 'Tine <br />cost submitted by the Contractor for "Asphalt Cement in WNTAC' per Ton of WMAC Complete". <br />for each WMAC pay item, will be used to calculate a price adjustment, if needed, per Section <br />00195 of the Special Provisions. <br />Costs submitted by the Contractor for "Asphalt Cement in WMAC Per Ton of WMAC <br />Complete", for any WMAC bid item, over twenty-sever (27) dollars per a ton will be <br />considered unbalanced and the bid will be rejected. <br />If you have questions about this addendum or the project, please call David Starns at (541) 682-8306. <br />All bidders shall acknowledge the receipt of and acceptance of this Addendum No. 1 by signing and submitting the <br />signed Addendum with the bid. Bids submitted without this Addendum, or with the Addendum not signed, will be <br />considered informal. <br />Mark Schoenmt,:. P E. , <br />Cit,, Em-Ineer <br />Receipt acknowledged and conditions agreed <br />thi ~&V of .2010. <br />Bidder: -1 C 4 ti coin r; Y <br />Addendum =1 -.lob 44582 Page I <br />
The URL can be used to link to this page
Your browser does not support the video tag.