CITY OF EUGENE <br />DEPARTMENT OF PUBLIC WORKS <br />ENGINEERING DIVISION <br />Change Order Jab # 4425, 4434 & 4502 <br />Gontract # 2009-19 CONTRACTOR: Wildish Construction Go. Change Order # 2 <br />{ADDRESS) PO Bax 1428 Date: 4!2612010 Eu~ene~ OR 97401 CAMS Date: <br />Reviewed by: Date: <br />Willagillespie Rd Inspector: M. Koivula V JE T. t OSouthwood Ln Jab 4425nFox Hal ow Rdnfrom E. A az~m..,. ( ) on Dr to Donald <br />St Job 4434 Crescent Ave from Shad ~ ow View to Cobu Rd Jab 4502 Proj, Mgr. M. Rodri ues Principal Eng. P. Itia~e_____ <br />You are directed to make the following changes in this contract: <br />Contract <br />Item N4. <br />80 Remove catch basin removal bid item on Count Glub Rd Jab #4425 <br />81 Perform work in interior of existin curb inlet #62919 on Count Club Rd Job #4425 <br />140 Remove new catch basin wii~ bike roof rate bid item on Count Club Rd ]ob #4425 <br />931 Perform work to connect to existin WW MH #16798 & SD MH #80072 on Crescent Ave a# Suzanne Wa Job #45D2 <br />This changes the bid items as follows: <br />Contract Contract Item Time Quantaty Unit Amended Net <br />No. Item Change Units} Cost Amount (*1-} Change Change 80 Removal of Catch Basins Ori inai 1.00 EA SDD.OD 500.00 ($500.00) <br />(]ob #4425) D Revised 0.00 DAO 0.00 Amended 0.00 $0.00 $D.DO $0.00 <br />81 Work on interior of curb inlet Country Club Rd Ori final 0.00 DAO OAD $0.00 <br />(Job #4425) 0 Revised 0.00 O.OD 0.00 Amended 1.00 LS $633.12 $533.12 $633.12 <br />140 Catch eosins, W/Bike Proof Grate Ori final 1.00 1200A0 i 200.00 ($1,2D0.00) (Job #4425) 0 Revised 0.00 OAO 0.00 <br />Amended OAO $DAO $0.00 $OAO <br />931 Extra work to connect to existing WW and SD Ori final QAO DAD 0.00 $OAO manholes Crescent AveJSuzanne Way 0 Revised OAO D.DD 0.00 <br />(Job #4502) Amended 1.D0 L5 $3,545.46 $3,545.45 $3,545.46 Ori final o.oo o.oa D.oo $aoo <br />a Revised 0.00 0.00 D.00 Amended 0.00 $0.00 $D.00 $QAO <br />Ori inai 0.00 0.00 0.00 $O.OD <br />0 Revised O.QO OAO 0.00 Amended O.OD $0.00 $0.00 $O.DO <br />The original contract work days are D.o da s <br />The contract time change this C.0 0,o da s <br />The contract time change by previous C.O.'s D,o da s The new contract work da s are D.o aays <br />The original contract sum was $811846.00 <br />Net change by previous change order „ i~2 olo.oo) <br />Net change due to amendment by previous change order $8,481.89 The contract sum prior to this change order was $818,317.89 <br />This change order will change contract sum by this amount $2 418.5$ The new contract net change sum {3,710.00) <br />The new contract amendment sum $12,660.47 <br />The new contract sum including this change order will..~~ x$20,796.47 Percents a of on final contract 1.10°~0 <br />NET CHANGE DUE TO AMENDMENTS 1.56°k <br />Approval by: <br />City Engineer Prime Contractor Third Party <br />tJJi~/~/YV <br />Date ~ Date Date <br />D CONTRACTOR ~ OFFICE FILE D PURCHASINGICRO <br />Q:IPRQJECTSIPROJ-5144251CanstructionlChange Orders14425-201D 03122010 mgkCOMBO JOB co #2,xls <br />- - - - <br />