New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4529 Wildish CO#4
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2010
>
GJN4529 Wildish CO#4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 10:42:41 AM
Creation date
5/5/2010 3:45:29 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004529
GL_Project_Number
985344
COE_Contract_Number
2009-00025
Retention_Destruction_Date
8/5/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF EUGENE <br />DEPARTMENT OF PUBLIC WORKS <br />ENGINEERING DIVISION <br />Change Order Job # 4340, 4529 Contract # 2009-25 <br />CONTRACTOR: Wiidish Construction Change Order # 4 (ADDRESS) PO Box 7428 Date: 412112010 <br />Eu ene, OR 97401-0248 CAMS Date: <br />Reviewed by; Date; PROJECT; 2009 Pavement Preservation Pro ram ~ Inspector B. Terrel <br />W 11th Avenue from Garfield St to T inn 5t Job #4340 K. Matwitz _ 6th & 7th Avenues from Hi h St to Washin tan St Job #4529 Proj. Mgr. M. Rodri ues <br />Principal Eng. P. Klo e <br />You are directed to make the fallowing changes in this contract: <br />COl~tfaCt Item <br />No. <br />241 Inclusion of Arrow Boards in Traffic Control Job #4529 <br />371 6th & Hi h Core & Ex laration Job #4529 <br />3l2 6th & Hi h SD Work Job #4529 <br />470 ADA Ram Concrete Grindin Job #4529 <br />591 Pavement Line & Le end Removal Job #4529 <br />621 0 ticom Wirin at 6th & Charnelton Traffic Si nal Job #4529 <br />This changes the bid items as follows: <br />Contract Contract <br />Item Time Quantity Unit Amended Net No. Item Change Units) Cost Amount ~+I-) Change Change <br />Ori final 0.00 0.00 0.00 $0.00 241 Arrow Boards (Job #4529) Revised 0.00 0,00 0.00 <br />Amended 309,00 HR $10.13 $3130.17 $3130,17 <br />Ori inai 0,00 0.00 0.00 $0,00 371 6th & High Core & Exploration (Job #4529) Revised 0,00 0.00 O.DO <br />Amended 1.00 L5 $4 010,33 $4 D10.33 $4 010.33 Ori inai 0.00 0,00 0.00 $0.00 <br />372 6th & High SD & WW Work (Job #4529} Revised 0.00 0,00 0.00 <br />Amended 1.00 LS $15 459.4b $15 459.46 $15 459.46 . Ori final 0,00 0,00 0.00 $p.o0 <br />471 ADA Ramp Concrete Grinding {Job #4529} Revised 0.00 0.00 0,00 Amended 1.00 L5 $6 818.81 $6 818.81 $fi 818.81 <br />Ori final D.DO a.DD 0.00 $0.00 591 Pvmt Line Removal (Job #4529) . Revised 0,00 OAO 0.00 <br />Amended iA0 LS $38,88 $38.88 $38.88 <br />Ori final 0.00 0.00 0,00 $0.00 621 Opticom Wiring at 6th & Chamelton (Jab #4529) Revised 0.00 0.00 0.00 <br />Amended 1.00 LS $374.40 $374.40 $374.40 <br />The original contract work days are o.D da s <br />The contract time change #his C.0 O.D da s The contract time change by previous C.O.'s a.o da s <br />The new contract work da s are O.o da s <br />The original contract sum was $789,5$S.OD Net change by previous change order . $4 2x;5.28 <br />Net change due to amendment by previous change order $ 484,12 <br />The contract sum prior to this change order was $803,334.40 This change order will change contract sum by this amount ~ , $29 s32.o5 <br />The new contract net change sum $4 265.28 The new contract amendment sum $39,316,17 <br />The new contract sum including this change order will be $833,166.45 <br />Percents a of on inai contract 5,52,6 NET CHANGE DUE TO AMENDMENTS 4.98% <br />Approval by: <br />City Engi eer Prime Contractor Third Party <br /> <br />Date Date Date <br />CONTRACTOR D OFFICE FILE D PURCMASINGICRO <br />Q:IPROJECTSIPROJ-914529 PPP Gbh-7#hlCantractlChange Orders14529-20100421 C04.xls <br />- - - - <br />
The URL can be used to link to this page
Your browser does not support the video tag.