Run Date: 04/21/2010 13:46:59 <br />City of Eugene <br />Esti <br />mate Distribution <br />Estimate: <br />Post Bid Estimate <br />Job <br />S"3-004589 2010 WASTEWATER REHABILITATION <br />Line No <br />. Description <br />Quantity <br />Unit <br />Unit Price <br />Amount <br />2010 WASTEWATER REHABILITATION <br />General <br />0010. <br />MOBILIZATION <br />1.00 <br />LUMPSUM <br />$33,600.00 <br />$33,600.00 <br />0020. <br />TEMP. PROTECTION AND DIRECTION OF TRAFFIC <br />1.00 <br />LUMPSUM <br />$5,000.00 <br />$5,000.00 <br />0030. <br />FLAGGERS <br />50.00 <br />HOUR <br />$48.00 <br />$2,400.00 <br />0040. <br />EROSION CONTROL <br />1.00 <br />LUMPSUM <br />$2,500.00 <br />$2,500.00 <br />0050. <br />CIPP LINER WASTEWATER 8 INCH <br />2,316.00 <br />FOOT <br />_$25.50 <br />$59,058.00 <br />0060. <br />CIPP LINER WASTEWATER 10 INCH <br />1,407.00 <br />FOOT <br />$29.00 <br />$40,803.00 <br />0070. <br />CIPP LINER WASTEWATER 12 INCH <br />965.00 <br />FOOT <br />$34.00 <br />$32,810.00 <br />0080. <br />CIPP LINER WASTEWATER 15 INCH <br />1,284.00 <br />FOOT <br />$46.50 <br />$59,706.00 <br />0090. <br />CIPP LINER WASTEWATER 18 INCH <br />444.00 <br />FOOT <br />$58.00 <br />$25,752.00 <br />0100. <br />CIPP LINER WASTEWATER 36 INCH <br />210.00 <br />FOOT <br />$150.00 <br />$31,500.00 <br />0110. <br />PIPE BURSTING AND HDPE LINER, WASTEWATER 6" <br />522.00 <br />FOOT <br />$34.00 <br />$17,748.00 <br />0120. <br />PVC TAPPING TEE <br />53.00 <br />EACH <br />$100.00 <br />$5,300.00 <br />0130. <br />SADDLE CONNECTION 6 INCH <br />10.00 <br />EACH <br />$150.00 <br />$1,500.00 <br />0140. <br />INTERNAL SERVICE RECONNECTION <br />6.00 <br />EACH <br />$595.00 <br />$3,570.00 <br />0150. <br />DYE TESTING AND CONNECTION VERIFICATION <br />22.00 <br />EACH <br />$175.00 <br />$3,850.00 <br />0160. <br />TV INSPECT AND LOCATE SERVICE LINE <br />12.00 <br />EACH <br />$300.00 <br />$3,600.00 <br />0170. <br />PIPE LINING VIDEO INSPECTION <br />1.00 <br />LUMPSUM <br />$12,500.00 <br />$12,500.00 <br />0180. <br />6 INCH C-900 PIPE <br />456.00 <br />FOOT <br />$52.00 <br />$23,712.00 <br />0190. <br />6 INCH PVC WASTEWATER PIPE <br />423.00 <br />FOOT <br />$47.00 <br />$19,881.00 <br />0200. <br />8 INCH PVC WASTEWATER PIPE <br />25.00 <br />FOOT <br />$60.00 <br />$1,500.00 <br />0210. <br />10 INCH PVC WASTEWATER PIPE <br />488.00 <br />FOOT <br />$60.00 <br />$29,280.00 <br />0220. <br />12 INCH STORM PIPE <br />14.00 <br />FOOT <br />$150.00 <br />$2,100.00 <br />0230. <br />PVC WASTEWATER SVC PIPE. MATCH EXISTING PIPE <br />288.00 <br />FOOT <br />$70.00 <br />$20,160.00 <br />0240. <br />CONCRETE MANHOLE, WASTEWATER - SHALLOW <br />1.00 <br />EACH <br />$1,800.00 <br />$1,800.00 <br />0250. <br />CONNECT TO EXISTING SERVICE LINE <br />67.00 <br />EACH <br />$150.00 <br />$10,050.00 <br />0260. <br />CONNECTION TO EXISTING STRUCTURES <br />6.00 <br />EACH <br />$500.00 <br />$3,000.00 <br />0270. <br />MINOR ADJUSTMENT OF MANHOLES <br />3.00 <br />EACH <br />$500.00 <br />$1,500.00 <br />0280. <br />MAJOR ADJUSTMENT OF MANHOLES <br />2.00 <br />EACH <br />$1,000.00 <br />$2,000.00 <br />0290. <br />OUTSIDE DROP ON EXIST. WASTEWATER MH <br />1.00 <br />EACH <br />$2,000.00 <br />$2,000.00 <br />0300. <br />POTHOLE <br />5.00 <br />EACH <br />$300.00 <br />$1,500.00 <br />0310. <br />TRENCH HMAC RESURFACING <br />125.00 <br />TON <br />$200.00 <br />$25,000.00 <br />0320. <br />CONCRETE CURB AND GUTTER <br />403.00 <br />FOOT <br />$25.00 <br />$10,075.00 <br />0330. <br />4" CONCRETE SURFACING <br />1,486.00 <br />SQFT <br />$9.00 <br />$13,374.00 <br />0340. <br />5" CONCRETE SURFACING <br />45.00 <br />SQFT <br />$10.00 <br />$450.00 <br />0350. <br />RE-INFORCED CONCRETE PAVEMENT 7" THICK <br />1,677.00 <br />SQFT <br />$12.00 <br />$20,124.00 <br />0360. <br />TRUNCATED DOME PANEL <br />8.00 <br />SQFT <br />$25.00 <br />$200.00 <br />0370. <br />TREE PROTECTION FENCING <br />400.00 <br />FOOT <br />$2.00 <br />$800.00 <br />0380. <br />TREE PROTECTION ROOT ZONE EXCAVATION <br />16.00 <br />EACH <br />$1,000.00 <br />$16,000.00 <br />0390. <br />LANDSCAPING <br />1.00 <br />LUMPSUM <br />$10,000.00 <br />$10,000.00 <br />Total <br />General <br />$555,703.00 <br />Total : 2010 <br />WASTEWATER REHABILITATION <br />$555,703.00 <br />2010 WASTEWATER REHABILITATION - Other / Direct <br />General <br />0010. <br />test <br />1.00 <br />LUMPSUM <br />$1,500.00 <br />$1,500.00 <br />0020. <br />Contingency <br />100 of Contract <br />$5.5,570.30 <br />0030. <br />Advertising <br />1.00 <br />LUMPSUM <br />$400.00 <br />$400.00 <br />0040. <br />Permits <br />1.00 <br />LUMPSUM <br />$0.00 <br />$0.00 <br />0050.. <br />Printing <br />1.00 <br />LUMPSUM <br />$207.21 <br />$207.21 <br />Total : <br />General <br />$57,677.51 <br />Total : 2010 <br />WASTEWATER REHABILITATION - Other / Direct <br />$57,677.51 <br />2010 WASTEWATER REHABILITATION - Miscellaneous <br />General <br />0010. <br />PSF CHARGES TO DATE (FOR EST) <br />1.00 <br />LUMPSUM <br />$69,370.40 <br />$69,370.40 <br />0020. <br />PSF REMAINDER OF PROJ (FOR EST) <br />1.00 <br />LUMPSUM <br />$64,000.00 <br />$64,000.00 <br />