Final Acceptance <br />Completion of Warranty Period <br />U Public Works <br />Engineering <br />99 East Broadway, Ste 400 <br />Eugene, OR 97401 <br />(541) 682-5291. <br />(541) 682-8410 <br />To: Wildish Construction <br />PO Box 7428 <br />Eugene, OR 97401-0428 <br />Project: Barger Dr - Primrose to Terry <br />Contract Number: 2008-22 <br />Date: April 30, 2010 <br />From: Dan Kepley <br />Job Number: 4433 <br />A warranty inspection has been made on this project in accordance with Section 00150 of the <br />City Standard Specifications and Standard Drawings. <br />No defects were noted and/or were corrected the project is hereby accepted by the City for <br />permanent maintenance. <br />FOR PRIVATELY ENGINEERED PROJECTS ONLY <br />Engineer. <br />Address: <br />Owner. <br />Address: <br />ENG 1122 Contractor File Engineer Owner Surety PW Admin Construction Manager Revised 4, ~~F <br />Finance/Accts Receivable for assessable projects or City Recorders Office for nonassessable projects 1~J//t~1 <br />