CITY OF EUGENE <br />DEPARTMENT OF PUBLIC WORKS • <br />ENGINEERING DIVISION <br />Change Order Job # 4613 <br />Gontraot # 2010.00017 CONTRACTOR: Keith Kokkeler Change Order # 1 (ADDRESS) Eims Landscape Service, Inc. ~ Date: 4115190 <br />28780 Ja er Lane CAMS Date: ' Junction City, Oregon 97448 <br />Reviewed. by: Date: PROJECT: Alton Baker Park - lm ation & Utili Im rovements Inspector: D. Durazo <br />PLA S. Milovich <br />praj. Mgr. A Steffen ~.b Principal Eng. M. Cahill <br />You are directed to make the following changes in this contract: <br />Contract <br />Item Na. <br />230 Add 4" Im atian isola0on Valve <br />240 Add 1 Irri ation Quick-Gou ler <br />250 Relocate Existin Li ht Pole near Metered Prima Elec~icaf Panel location <br />260 Relocate Existin Li ht Poles near Power Pedestals p5 & P2 <br />Thls changes the bEd items as follows: <br />Contract Contract <br />Item Time Quantity Unit Amended Net No. Item Change (Units) Cast Amount (f!•) Change Change <br />230 Add 4" Imgation Isolation Valve 1 Ori final 0.00 .00 OAO $0.00 <br />Revised o.ao o.aa o.oD Amended 1,00 LS $948.30 $948,30 $948.30 <br />240 Add {1) Irrigation Quick Coupler 0 0 final 0.00 0.00 0.00 $0.00 Revised 0.00 0.00 0.00 <br />Amended 1.00 LS $227.00 $227.00 $227.00 <br />350 Relocate Existing light Pole near Metered Primary 0 Ori final OAO 0.00 0.00 ,$0,00 Electrical Panel location Revised 0.00 0,00 0,00 <br />Amended 1.oD LS $331.00 $337.00 $337.00 260 Relocate Existing Light Pole near Power ~0 Ori final 0.00 ~ 0.00 ~ ~ 0.00 $0.00 <br />Pedestal P5 & P2 Revised 0.00 0.00 O.DO <br />Amended 2,00 EACH $414.00 $828.00 $828.00 Ori final 0.00 ~ 0.00 O.OD $0.00 <br />Revised o.oo o.oD aoD Amended 0.00 $7.00 $0.00 $0.00 <br />Ori final 0.00 - DAD 0.00 $DAO Revised 0'.00 0.00 0.00 <br />Amended 0.00 $0.00 $0,00 $OAO <br />The original contract work days are o.0 da s <br />The contract time change this C.0 1.0 da s The contract time change by previous C.O.'s o.0 : as s <br />The new contract work da s are 1.0 da s <br />The original contract sum was $952,302.24 <br />Net change by previous change order $O.Op Net change due to amendment by previous change order $O.DO <br />The contract sum prior to this change order was $152,302.24 <br />This change order will change cantrac# sum by this amourif $2 34a3o The new contract net change sum , ~ $0.00 <br />The new contract amendment sum - $2,340.30 . The new contract sum including this change order will be $154,642.54 <br />Percenta a of on inai contract 1,~% <br />NET CHANGE DtJt: TO AMENDMENTS , ~ 1.54% <br />Approvai by: , <br />City Engineer P e antr r Third Party <br />Date t Date <br />CONTRACTOR ~ OFFICE FILE ~ PURCHASINGlCRO <br />QIFORMSIPROJECTICONSTIREVISED GWANGE ORDER.}(LS <br />