<br />GREEN RIDGE CONCRETE <br />P.O. BOX 50787 <br />Eugene, OR 97405 <br />Bid for: <br />Eweb <br />Water Wise Garden <br />Alton Boker Park <br />Exhibit B <br />Estimate <br />Date <br />4/13/2010 <br />Job and oddress <br />Alton Baker Park <br />Work to be done Quantity/ Inft /... cost per. Toto! <br />" Large area" slobs (3 wedges and two squares) <br />approx 930 sgft <br />loy out and set-up 700.00 700.00 <br />concrete (3500 psi 1/2" rock) 14 100.00 1,400.00 <br />concrete pump 230.00 230.00 <br />place and finnish labor 1,500.00 1,500.00 <br />15 walkway pods <br />lay out and set-up 300.00 300.00 <br />concrete (3500 psi 1/2" rock) 5 100.00 500.00 <br />concrete pump 230.00 230.00 <br />pkce and finnish labor 450.00 450.00 <br />Exposed agg. finnlsh would look so much nicer , i <br />would be willing to do so for materials cost of <br />$450.00 <br /> Total $5,330.00 <br />Phone # Fax # <br />541-337-3396 541-505-7894 <br />