NOTICE OF INTENT <br />Non-Highway (Transit, Bike, Ped, Other) Project Readiness Funds - March 2010 <br />FAX this completed Notice to: <br />Bicycle/Pedestrian projects (503) 986-3290 or email PDF copy to: patricia.r.fisherna odot.state.or.us <br />Transit/TDM projects (503.986.4189) or email PDF copy to: Dinah.vanderhyde@odot.state.or.us <br />INSTRUCTIONS: <br />1. Enter PROJECT INFORMATION in the boxes below. Keep all entries on one page. <br />2. Complete the NARRATIVE page to briefly explain the project scope, readiness and benefits according <br />to the priority factors identified in the application announcement. <br />You may expand or reduce the boxes for each section but do not exceed one page overall. <br />3. Attach a vicinity map and SITE MAP or other appropriate graphics-1 or 2 paces. <br />APPLICANT <br />Agency <br />City of Eugene <br />Contact <br />Lee Shoemaker <br />Address <br />99 E. Broadway, Suite 400 <br />Title <br />Bicycle and Pedestrian <br />Eugene, OR 97401-3174 <br />Coordinator <br />Telephone <br />541-682-5471 <br />Email <br />lee. shoemakerci.eugene.or.us <br />CO-APPLICANT (if an <br />Name <br />Contact <br />Address <br />Title <br />Telephone <br />Email <br />PROJECT (name, location, and one-line description) North Bank Path Rehabilitation and Lighting. <br />This path and lighting project would replace a narrow failing mostly asphalt path, widening sub-standard <br />portions, and would add lighting. <br />COST SUMMARY <br />RIGHT-OF-WAY NEEDS <br />1-Total Project Cost <br />1 <br />211 <br />876 <br />Need to acquire property or easements? <br />including construction <br />, <br />, <br />[ ] yes [ X ] no [ ] don't know et <br />2-PE/Readiness Cost <br />$154 <br />379 <br />included above <br />, <br />3-Local Match or <br />$15 <br />855 <br />Need permits or agreements from other agencies? <br />Non-Eligible Costs <br />, <br />[ ]yes X no don't know et <br />4-Funds Requested <br />$138 <br />524 <br />#2 minus #3 <br />, <br />COORDINATION ISSUES (mark all that apply) <br />[ X ] Project located in MPO jurisdiction [ ] Project on railroad property <br />(metropolitan area with population >50,000) [ ] Project at or near a railroad crossing <br />[ ] Project within state highway right-of-way [ ] Contribution from other than applicant <br />[ ] Use of land owned by another agency [ ] Maintenance by other than applicant <br />STP Readiness 2010 - Narrative <br />North Bank Path STP-Readiness-NOI.. docx March 2010 <br />