C <br />(1-16 q/ <br />gb_5_57 41 <br />13th from WS Kincaid to ES Alder <br />Construction Costs <br />Quanti <br />Unit <br />Unit Price <br />Total <br />0010 <br />Mobilization <br />1 <br />LS <br />$20,000.00 <br />$20,000.00 <br />0020 <br />Temporary Work Zone Traffic Control - Complete <br />1 <br />LS <br />$10,000.00 <br />$10,000.00 <br />0030 <br />Erosion Control <br />1 <br />LS <br />$2,500.00 <br />$2,500.00 <br />0040 <br />Temporary Striping <br />1 <br />LS <br />$1,500.00 <br />$1,500.00 <br />0050 <br />Flagging <br />200 HOUR <br />$45.00 <br />$9,000.00 <br />0060 <br />Remove/Reinstall Parking Meters <br />6 <br />EA <br />$200.00 <br />$1,200.00 <br />0070 <br />Remove/Reinstall Bumper Blocks <br />40 <br />EA <br />$100.00 <br />$4,000.00 <br />0080 <br />Level 2,1/2" Dense HMAC <br />460 <br />TON <br />$55.00 <br />$25,300.00 <br />0090 <br />Cold Plane Pavement Removal, 2" <br />7350 <br />SF <br />$0.70 <br />$5,145.00 <br />0100 <br />Asphalt Concrete Pavement Repairs <br />500 <br />CY <br />$55.00 <br />$27,500.00 <br />0110 <br />Thermopast, Non-Prof, 90 Mil, Extruded <br />1 <br />LS <br />$5,000.00 <br />$5,000.00 <br />0120 <br />Pavement Line, Type A-1 or A-2 <br />120 <br />SF <br />$7.00 <br />$840.00 <br />0130 <br />Pavement Line, Type A-2: Arrows <br />0 <br />EA <br />$200.00 <br />$0.00 <br />0140 <br />Pvmt Legend, Type A2 OR B: Bike Lane Symbols <br />4 <br />EA <br />$280.00 <br />$1,120.00 <br />0150 <br />Loop Detector Installation <br />0 <br />EA <br />$650.00 <br />$0.00 <br />0160 <br />Adjust Manholes <br />2 <br />EA <br />$1,250.00 <br />$2,500.00 <br />0170 <br />Replace frame and cover - waste water <br />13 <br />EA <br />$250.00 <br />$3,250.00 <br />0180 <br />Replace frame and cover - storm water <br />12 <br />EA <br />$250.00 <br />$3,000.00 <br />0190 <br />Adjust Valve Boxes <br />2 <br />EA <br />$250.00 <br />$500.00 <br />Total Construction <br />$122,355.00 <br />Testing <br />2.00% <br />$2,447.10 <br />Contingency <br />20.00% <br />$24,471.00 <br />Preliminary Engineering <br />13.00% <br />$19,405.50 <br />Construction Engineering <br />10.00% <br />$14,927.31 <br />3 T/ SubTotal13th from WS Kincaid to ES Alder- $183,605.91 <br />5 Cif VV <br />WV <br />V <br />