New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4625 Wildish 2010-00016
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2010
>
GJN4625 Wildish 2010-00016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 12:29:15 PM
Creation date
3/22/2010 10:05:51 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004625
GL_Project_Number
995884
COE_Contract_Number
2010-00016
Retention_Destruction_Date
6/1/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
pARIS0% ESTIMATE <br />OJECT COST COM <br />~ IMpRpVEINENT P? <br />F ~ CAPITA encYl <br />overrâ–ºment Ag <br />. 4+ to or Local G <br />F (Name of Sta NIE' <br />z PROJECT NA <br />a' <br />FUND: <br />NT: PROJECT NUMEER: Agency Contract estimate <br />PROJ <br />DEpARTM ency Force Estimate Total Cost <br />PROPOSED YEAR Ag Unit Cost <br />10N: Work Total Cost <br />PROJECT DESCRIPT tion unit cost <br />Class Description <br />Rough Units <br />Quantity <br />Estimates <br />0 Contractor (check one) <br />the Agency <br />CTION PERIOD at the least cost by Official) <br />APED CONSU erformed of Agency <br />missioner of the <br />ESTIM this project can be P (Signature <br />fined that and file with the name dands to estimating <br />has determ Shall prepare ment by perform <br />agency each improve state's policy <br />The above-named agency If the agency inten <br />riod, each eriod, identifying s to the and accurate <br />uent budget pe budget p rivate tcontractor conform <br />subseq fans to fundinthe full, true <br />i ment decision a <br />budget for the ency P erform the construction by a p and preserve <br />to adoption of its agency that the ag intends to P the agency must also sho okee its <br />prior t agency 000, are required u used. <br />days p n to the th more than $125, encies of any eq p . <br />than 30 know ent as to whether teo CQSt m ency, Public a9 e at costs, <br />rovement <br />305 requires that not less public imp statement raj t estimated the Public a9 investm a ency's least cost analysis <br />ORS 279C list of every contain a least cost to and the cost, including ort the g <br />Industries a list shall also ersonnel o eats at the WH_119) may be used to rep <br />of Labor and costs. The e uipment and person" <br />rovem <br />Bureau on-site constru theagency's own q ublic imp and administrative expenses, <br />eats. This form <br />the total on- effort to construct pail engineering improve <br />work using every work, including tanned public imp <br />construction encies ma e~form, the be used to list p <br />that public a9 costs of P mary) may <br />account of the public Improvement summary) <br />Wage Rate Unit <br />FormWH"118 (Planned prevailing Division, #1045 <br />s should be mailed to' Wage and of Hour Labor and Industries <br />d form Bureau Oregon St. <br />complete 800 N.E. 87232-2180 <br />Portland, OR <br />
The URL can be used to link to this page
Your browser does not support the video tag.