LABORER (Continued) <br />Note: All job or project locations shall be computed <br />(determined) on the basis of road miles and in the <br />following manner. A mileage measurement will start at <br />the entrance to the respective city hall, facing the project <br />(if possible), and shall proceed by the normal route <br />(shortest time-best road) to the geographical center on <br />the highway, railroad, and street construction projects <br />(end of measurement). On all project contracts, the <br />geographical center where the major portion of the <br />construction is located, shall be considered the center of <br />the project (end measurement). <br />LIMITED ENERGY ELECTRICIAN <br />Area 2 <br />26.95 <br />13.66 <br />Area 3 <br />23.03 <br />11.49 <br />Area 4 <br />26.04 <br />11.43 <br />Area 5 <br />26.95 <br />12.66 <br />Area 6 <br />24.90 <br />10.65 <br />Zone Pay for Area 6 Limited Energy Electricians <br />(Add to Basic Hourly Rate) <br />LIMITED ENERGY ELECTRICIAN <br />(Continued) <br />a) Those portions lying west of a line running North and <br />South from the NE corner of Coos County to the SE <br />corner of Lincoln County. <br />(b) Those portions lying east of a line running North and <br />South from the NE corner of Coos County to the SE <br />corner of Lincoln County. <br />(c) South half <br />(d) North half <br />LINE CONSTRUCTOR <br />Area 1 <br />Group 1 <br />47.66 <br />12.99 <br />Group 2 <br />41.44 <br />12.75 <br />Group 3 <br />29.12 <br />9.77 <br />Group 4 <br />35.64 <br />10.26 <br />Group 5 <br />31.08 <br />9.84 <br />Group 6 <br />29.01 <br />9.76 <br />Area 1 All counties except Malheur County <br />Zone mileage based on air miles: <br />Group 1 <br />Group 3 <br />Cable Splicer <br />Tree Trimmer <br />Zone 1 0-20 miles 0.00 <br />Leadman Pole Sprayer <br />Zone 2 21-30 miles 1.50 <br />Zone 3 31-40 miles 3.30 <br />Group 2 <br />Group 4 <br />Zone 4 41-50 miles 5.00 <br />Certified Lineman Welder <br />Line Equipment Man <br />Zone 5 51-60 miles 6.80 <br />Heavy Line Equipment Man <br />Zone 6. 60 or more 9.50 <br />Journeyman Lineman Welder <br />Group 5 <br />Journeyman Lineman <br />Head Groundman <br />There shall be a 20-mile free zone from the <br />Lineman <br />JackHammer Man <br />downtown Post Office in Grants Pass <br />Klamath <br />Heavy Equipment Man <br />Powderman <br />, <br />Falls, Medford, and Roseburg. <br />Pole Sprayer <br />Group 6 <br />Groundman <br />Area 2 Area 3 Area 4 <br />Gilliam <br />Coos <br />Lane (b) <br />Grant <br />Curry <br />Marion <br />Morrow <br />Lane (a) <br />Polk <br />Umatilla <br />Yamhill (c) <br />Wheeler <br />MARBLE SETTER 33.29 14.08 <br />(This trade is tended by "Tile, Terrazzo, & Marble <br />Finishers") <br />PAINTER & DRYWALL TAPER <br />Area 5 Area 6 <br />Clackamas Jackson <br />Clatsop Josephine <br />Columbia <br />Multnomah <br />Tillamook <br />Washington <br />Yamhill (d) <br />Commercial Painting 19.69 7.44 <br />Industrial Painting 23.34 7.44 <br />Add $0.75 to base rate for work over 60 ft. high on <br />swing stage, mechanical climber, spider or bucket <br />truck for both commercial and industrial painting. <br />JANUARY 2010 APPENDIX <br />PAGE 121 <br />