Run Date <br />02/23/2010 16:39:22 <br />Page 1 <br />Revised Bid Schedule <br />Job No, 93 <br />-004625 <br />Bid No 2010-000002 <br />Line <br /> <br />No. Descr.i tion <br /> <br />Quantity <br /> <br />Uii.z.t <br /> <br />Uni.. P <br />......'.:~ce <br />Amount <br />EUGENE AIRPORT REHAB OF RUNWAY 16R/34L - ATP 3-41-0018-45 <br />93-004625 <br />APT-OVERLAY RUNWAY 16R/34L <br />inclusive <br />through Addendum No. 0003 Listed in Bold <br />General <br />1 <br />® <br />7L~ C(~ ~r <br />0010. <br />MOBILIZATION <br />1.000 <br />LUMPSUM <br />$ l <br />C~ <br /> <br />~ <br />Tmm <br />$ <br />~ <br />0020. <br />EROSION CONTROL <br />1.000 <br />LUMPSUM <br />$J l(~~`~ T <br />$ t <br />0030. <br />SURVEY, COMPLETE <br />1.000 <br />LUMPSUM <br />c)C'0 <br />$ <br />0040. <br />BARRICADES <br />15.000 <br />EACH <br /> <br />0050. <br />LIGHTED CLOSURE CROSS MAINTENANCE <br />82 000 <br />DAY <br />$ c"o u <br />$ (_-^(~a ! <br />0060 <br />PORTABLE FLOODLIGHT UNITS <br />20 000 <br />EACH <br />$ , <br />$ <br />0070. <br />CLEARING A.ND GRUBBING <br />1 000 <br />LUMPSUM <br />0080. <br />COLD PLANING <br />1.000 <br />LUMPSUM <br />r 12 <br />32 <br />~ <br />$ 5 <br />tt <br />~js <br />- <br />- <br />_ <br /> <br />_ <br /> <br />^ <br />0090. <br />OVER-EXCAVATION AND P-154 BACKFILL <br />7,000.000 <br />CUYD <br />-1.1 <br />$ <br />jmtw- <br />0100. <br />.EXCAVATION, UNCLASSIFIED <br />22, 807. 000 <br />CUYD <br />$ )(37 <br />` <br />0110 <br />GEOTEXTILE FABRIC, TYPE SR <br />53,126.000 <br />SQ`ID <br />$ r <br />$ 3 <br />-7J <br />J <br />0120. <br />6" SUBBASE COURSE, P-154 <br />53,126 000 <br />SQYD <br />$ YW <br />$ ®1 p - <br />0130 <br />5" AGGREGATE SASE, P-208 <br />43,492.000 <br />SQYD <br />.3 <br />$ <br />I <br />0140. <br />CRUSHED AGGREGATE SURFACE COURSE <br />150 000 <br />TON <br />$ ll <br />$ ('0o <br />' <br />Z ~O <br />~ <br />0150. <br />BITUMINOUS SURFACE COURSE, P--401 <br />23,000 000 <br />TON <br />.$_1Lr <br />~ <br />j <br />$ <br />0160 <br />BITUMINOUS SASE COURSE <br />P-403 <br />29 <br />500 000 <br />TON <br />$ ✓ <br />$ d ® <br />, <br />, <br />