New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4625 Wildish 2010-00016
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2010
>
GJN4625 Wildish 2010-00016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 12:29:15 PM
Creation date
3/22/2010 10:05:51 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004625
GL_Project_Number
995884
COE_Contract_Number
2010-00016
Retention_Destruction_Date
6/1/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF EUGENE Miami <br />PROPOSAL <br />MARCH 2, 2010, 2:00 P.M. JOB 94625 BID NUMBER 2 <br />TO THE CITY MANAGER BIDDER' WILDISH CONSTRUCTION CO. <br />EUGENE, OREGON <br />The undersigned Bidder declares: <br />That Bidder has carefully examined and incorporates in this Proposal, by this reference all documents included <br />in the Book of Contract Documents and Specifications for this job which includes but is not limited to the Plans, General <br />Provision and Technical Specifications, City Standard Specifications and Standard Drawings, Supplemental <br />Specifications and Special Provisions, and City of Eugene Amendment #1 and #2, Addenda, Bid Schedule, Prevailing <br />Wage Rates, Contract Form, and Bond Form for <br />EUGENE AIRPORT <br />REHAB OF RUNWAY 16R/34L <br />CAPITAL IMPROVEMENT PROJECT <br />That Bidder has made an examination of the site of the proposed work and has made such investigations as are <br />necessary to determine the character of the material and the conditions to be encountered, independently ofthe indication <br />on the plans; and that if the Proposal is accepted, Bidder will contract with the City of Eugene as provided in the Contract <br />Form, will to the extent of this bid, provide the necessary machinery, tools, apparatus, and other means of construction, <br />and will furnish all material and labor as specified, or called for by the Plans or necessary to complete the work in the <br />manner specified and in accordance with the requirements of the Engineer. <br />The undersigned also agrees that Bidder will commence work within five (5) days after receipt of Notice to <br />Proceed. In addition to the completion dates and liquidated damages included in specifications Section 80 the Bidder <br />will complete the work in all respects after commencement and will have the project completed as specified in the <br />General Provisions and that Bidder will pay as liquidated damages to the City for any delay as specified in the General <br />Provisions. <br />O'iGil'JAL <br />PROPOSAL- JOB #4625 PAGE 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.