New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4664 4657 Wildish 2010-00015
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2010
>
GJN4664 4657 Wildish 2010-00015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 12:47:03 PM
Creation date
3/22/2010 10:05:50 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004664
GL_Project_Number
905134
COE_Contract_Number
2010-00015
Retention_Destruction_Date
6/30/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FEBRUARY 23, 2010, 2:00 P.M. <br />TO THE CITY MANAGER <br />EUGENE, OREGON <br />The undersigned Bidder declares: <br />CITY OF EUGENE <br />PROPOSAL 41 ff -LOW <br />JOB #4664 & 4657 BID NUMBER 1 <br />BIDDERWILDISH CONSTRUCTION CO. <br />That Bidder has carefully examined and incorporates in this Proposal, by this reference all documents included <br />in the Book of Contract Documents and Specifications for this job which includes but is not limited to the Plans, City <br />Standard Specifications and Standard Drawings, Supplemental Specifications and Special Provisions, and City of Eugene <br />Amendment #1 and #2, Addenda, Bid Schedule, Prevailing Wage Rates, Contract Form, and Bond Form for <br />11TH AND 13TH AVENUE PAVING <br />11"' AVENUE FROM GARFIELD STREET TO TYINN STREET - JOB #4664 <br />13TH AVENUE FROM ALDER STREET TO WASHINGTON STREET - JOB #4657 <br />CAPITAL IMPROVEMENT PROJECT <br />That Bidder has made an examination of the site of the proposed work and has made such investigations as are <br />necessary to determine the character of the material and the conditions to be encountered, independently of the indication <br />on the plans; and that if the Proposal is accepted, Bidder will contract with the City of Eugene as provided in the Contract <br />Form, will to the extent of this bid, provide the necessary machinery, tools, apparatus, and other means of construction, <br />and will furnish all material and labor as specified, or called for by the Plans or necessary to complete the work in the <br />manner specified and in accordance with the requirements of the Engineer. <br />The undersigned also agrees that Bidder will commence work within five (5) days after receipt of Notice to <br />Proceed and that Bidder will complete the work in all respects after commencement and will have the project completed <br />as specified in the Special Provisions and that Bidder will pay as liquidated damages to the City for any delay as specified <br />in the Special Provisions. <br />PROPOSAL -JOB #4664 & 4657 PAGE 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.