Final Acceptance <br />Completion of Warranty Period <br />Admkl <br />~W~j Public Works <br />Engineering <br />99 East Broadway, Ste 400 <br />Eugene, OR 97401 <br />(541) 682-5291 <br />(541) 682-8410 <br />To: 2 G Construction <br />Attn: Duane Strickland <br />PO Box 11735 <br />Eugene OR 97440 <br />Date: March 9, 2010 <br />From: Keith Jurasevich <br />Project: 2008 WASTEWATER MANHOLE REHABILITATION <br />Contract Number: 2009-09 <br />Job Number: 4117 <br />A warranty inspection has been made on this project in accordance with Section 00150 of the <br />City Standard Specifications and Standard Drawings. <br />No defects were noted and/or were corrected the project is hereby accepted by the City for <br />permanent maintenance. <br />FOR PRIVATELY ENGINEERED PROJECTS ONLY <br />Engineer. <br />Address: <br />Owner. <br />Address: <br />Q:\PROJECTS\PROJ-7\4117\Correspondence\Contractors\4117-20100309 kmj Final Acceptance Completion of Warranty Period.doc <br />ENG 1122 Contractor File Engineer Owner Surety PW Admin Construction Manager Revised 4104 <br />Finance/Accts Receivable for assessable projects or City Recorders Office for nonassessable projects Vb <br />