Final Acceptance Public Works <br />Completion of Warranty Period engineering <br />99 East Broadway, Ste 400 <br />Eugene, OR 97401 <br />(541) 682-5291 <br />(541) 682-8410 <br />To: Sue Parmer Boyd <br />Delta Construction Co. <br />999 Division Ave. <br />Eugene, OR 97404 <br />Project: Aerie Park Subdivision <br />Contract Number: 2007-506 <br />Date: March 3, 2010 <br />From: Keith Jurasevich <br />Job Number: 4412 <br />A warranty inspection has been made on this project in accordance with Section 00150 of the <br />City Standard Specifications and Standard Drawings. <br />No defects were noted and/or were corrected the project is hereby accepted by the City for <br />permanent maintenance. <br />FOR PRIVATELY ENGINEERED PROJECTS ONLY <br />Engineer. Goebel Engineering & Surveying <br />Address: 310 Garfield Street <br />Eugene, OR 97402 <br />Owner Chris Rowe <br />Address: 1450 West 7th Ave. <br />Eugene, OR 97402 <br />Q:\PROJECTS\PROJ-2\4412\Correspondence\Contractors\4412-20100303 kmj Final Acceptance Completion of Warranty Period.doc <br />ENG 1122 Contractor File Engineer Owner Surety PW Admin --Gesstuction..Manager 0) Revised 4/04 <br />Finance/Accts Receivable for assessable projects or City Recorders Office for nonassessable projects Mh <br />