Run Date: 02/26/2010 15:24:48 City of Eugene <br />Estimate Distribution <br />Estimate: Post Bid Estimate <br />Job 93-004664 PPP W 11TH AVE OVERLAY/GARFIELD TO TYINN <br />N <br />Li <br />tion <br />Descri <br />Quantity <br />Unit <br />Unit Price <br />o. <br />ne <br />p <br />PPP W 11TH AVE OVERLAY/GARFIELD TO TYINN <br />General <br />0010. <br />MOBILIZATION <br />1.00 <br />LUMPSUM <br />$9,500.00 <br />0020. <br />TEMP. WORK ZONE TRAFFIC CONTROL, COMPLETE <br />1.00 <br />LUMPSUM <br />$9,000.00 <br />0030. <br />TEMPORARY STRIPING <br />1.00 <br />LUMPSUM <br />$4,000.00 <br />0040. <br />SEQUENTIAL ARROW SIGNS <br />50.00 <br />DAY <br />$85.00 <br />0050. <br />PORTABLE CHANGEABLE MESSAGE SIGNS <br />50.00 <br />DAY <br />$75.00 <br />0060. <br />FLAGGERS <br />500.00 <br />HOUR <br />$45.00 <br />0070. <br />CITY PROVIDED SPEC INFO SIGNS <br />4.00 <br />EACH <br />$150.00 <br />0080. <br />SPECIAL ARRA PROJECT SIGNS <br />44.00 <br />SQFT <br />$15.00 <br />0090. <br />EROSION CONTROL <br />1.00 <br />LUMPSUM <br />$1,000.00 <br />0100. <br />ADJUSTING BOXES <br />15.00 <br />EACH <br />$200.00 <br />0110. <br />MINOR ADJUSTMENT OF MANHOLES <br />26.00 <br />EACH <br />$1,250.00 <br />0120. <br />REM/REPL FRAME/COVER-ST <br />14.00 <br />EACH <br />$275.00 <br />0130. <br />REM/REPL FRAME/COVER-WW <br />5.00 <br />EACH <br />$275.00 <br />0140. <br />COLD PLANE PVMT REMOVAL, 2" DEEP <br />201,600.00 <br />SQFT <br />$0.16 <br />0150. <br />COLD PLANE PVMT REMOVAL, 4" DEEP <br />12,150.00 <br />SQFT <br />$0.37 <br />0160. <br />LEVEL 3, 1/2" DENSE WMAC <br />2,930.00 <br />TON <br />$46.00 <br />0170. <br />PVMT LEGEND, TYPE B: ARROWS <br />19.00 <br />EACH <br />$235.00 <br />0180. <br />PVMT LINE, TYPE B <br />1,810.00 <br />SQFT <br />$7.00 <br />0190. <br />MONO-DIRECTIONAL CRYSTAL TYPE I MARKERS <br />270.00 <br />EACH <br />$5.00 <br />0200. <br />BI-DIRECTIONAL YELLOW TYPE I MARKERS <br />205.00 <br />EACH <br />$5.00 <br />0210. <br />THERMOPLASTIC, NON-PROFILE, 90 MIL, EXTRUDED <br />1.00 <br />LUMPSUM <br />$9,000.00 <br />0220. <br />LOOP DETECTORS INSTALLATION <br />60.00 <br />EACH <br />$476.00 <br />0230. <br />JUNTION BOX, TYPE 1 <br />1.00 <br />EACH <br />$225.00 <br />0240. <br />CONDUIT UNDER HARDSURFACING <br />135.00 <br />FOOT <br />$28.00 <br />0250. <br />LOOP FEEDER CABLE <br />400.00 <br />FOOT <br />$1.59 <br />Total <br />General <br />Total : PPP W 11TH AVE OVERLAY/GARFIELD TO TYINN <br />PPP W 11TH AVE OVERLAY/GARFIELD TO TYINN - Other / Direct <br />0010. test <br />0020. Contingency <br />0030. Advertising <br />0040. Printing <br />0050. Consultants <br />0060. ODOT admin costs <br />0070. BOLI PW FEE <br />Total : General <br />Total : PPP W 11TH AVE OVERLAY/GARFIELD <br />Amount <br />$9,500.00 <br />$9,000.00 <br />$4,000.00 <br />$4,250.00 <br />$3,750.00 <br />$22,500.00 <br />$600.00 <br />$660.00 <br />$1,000.00 <br />$3,000.00 <br />$32,500.00 <br />$3,850.00 <br />$1,375.00 <br />$32,256.00 <br />$4,495.50 <br />$134,780.00 <br />$4,465.00 <br />$12,670.00 <br />$1,350.00 <br />$1,025.00 <br />$9,000.00 <br />$28,560.00 <br />$225.00 <br />$3,780.00 <br />$636.00 <br />$329,227.50 <br />$329,227.50 <br />2% of Contract <br />$6,584.55 <br />3.5% of Contract <br />$11,522.96 <br />1.00 LUMPSUM <br />$500.00 <br />$500.00 <br />1.00 LUMPSUM <br />$200.00 <br />$200.00 <br />1.00 LUMPSUM <br />$6,000.00 <br />$6,000.00 <br />1.00 LUMPSUM <br />$5,000.00 <br />$5,000.00 <br />0.1% of Contract <br />$329.23 <br />$30,136.74 <br />TO TYINN - Other / Direct <br />$30,136.74 <br />PPP W 11TH AVE OVERLAY/GARFIELD TO TYINN - Miscellaneous <br />General <br />0010. Engineering Charge 1.00 LUMPSUM $57,000.00 $57,000.00 <br />0020. AS-CONST. 11MONTH WARRANTY CHARGE 1.00 LUMPSUM $1,500.00 $1,500.00 <br />Total : General $58,500.00 <br />Total : PPP W 11TH AVE OVERLAY/GARFIELD TO TYINN - Miscellaneous $58,500.00 <br />Total : Post Bid Estimate $417,864.24 <br />