New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4275 Begin Warranty
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2010
>
GJN4275 Begin Warranty
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 1:02:14 PM
Creation date
3/4/2010 10:30:24 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004275
GL_Project_Number
975394
COE_Contract_Number
2009-00018
Retention_Destruction_Date
6/2/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Notification of Commencement and <br />Public Works <br />'Completion Dates for Contract Projects Engineering <br />City of Eugene <br />99 E. Broadway, #400 <br />Eugene, OR 97401 <br />(541) 682-5291 <br />DATE <br />CONTRACT NO. <br />2/25/2010 <br />2009-18 <br />PROJECT NAME <br />JOB NO. <br />Elmira Road & Maple Street <br />4275 <br />CONTRACTOR <br />FEDERAL AID PROJECT NO. <br />Knife River <br />INSPECTOR <br />1 <br />PHONE NUMBER <br />DATE OF AWARD <br />Bryan Root <br />541-682-8307 <br />05/01/2009 <br />FIRST NOTIFICATION <br />05/11/2009 IS THE DATE ON WHICH THE CONTRACT WORK BEGAN. <br />Inspector Signature <br />SECOND NOTIFICATION <br />SPECIFIED COMPLETION DATE (S) (FROM SECT. 00180.50) DAYS CHARGED <br />DATE (S) THE WORK WAS SUBSTANTIALLY <br />BEYOND SPECIFIED <br />COMPLETED & THE TIME CHARGES STOPPED. <br />` COMPLETION <br />10/01/2009 <br />10/01/2009 <br />ALL CLAIMS FOR ADDITIONAL COMPENSATION MUST BE SUBMITTED BY: 1210112009 <br />(SEE SUBSECTION 00199.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br />Inspector Signature <br />THIRD NOTIFICATION <br />Notice of Completion. Begin Warranty Period. <br />10/01/2009 IS THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND <br />PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br />REQUIRED UNDER THE CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. <br />IN ACCORDANCE WITH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT #1 and #2, ALL WORK IS GUARANTEED <br />BY THE CONTRACTOR FOR ONE YEAR FOLLOWING THE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. MANUFACTURE <br />WARRANTIES REMAIN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN THE REQUIRED <br />ONE YEAR. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN WORK THAT <br />BECOME EVIDENT WITHIN THE ONE-YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE WITHIN THE ONE-YEAR yA WNTY <br />PERIOD WILL BE REQUIRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE REPAIR.- ,%i / <br />For Privately Engineered Projects Only <br />Engineer: <br />Address: <br />Owner: <br />J. <br />DISTRIBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION: <br />Contractor Engineer Owner Construction Manager File Ginger Perales, PWM <br />ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION: <br />Maintenance-Planning Surety PW Administration PIC Engineering PWE As Construct Monitor MADD Supervisor Inspector <br />QAPROJECTS\PROJ-5\4275 Elmira_ Maple\Correspondence\Contractors\4275-20100224-Third Notification.doc <br />March 2009 wko <br />
The URL can be used to link to this page
Your browser does not support the video tag.