Run Date: 02/17/2010 09:26:12 <br />City of Eugene (01- TD M NC ~(Vi <br />Engineer's Estimate t <br />Estimate: PPP 2010 Storm Rehab <br />Job 93-004674 PPP 2010 STORM REHAB <br />Line No. Description <br />PPP 2010 STORM REHAB <br />General <br />Quantity <br />Unit <br />Unit Price <br />Amount <br />0010. <br />MOBILIZATION <br />1.00 <br />LUMPSUM <br />$10,000.00 <br />$10,000.00 <br />0020. <br />TEMP. WORK ZONE TRAFFIC CONTROL, COMPLETE <br />1.00 <br />LUMPSUM <br />$7,000.00 <br />$7,000.00 <br />0030. <br />EROSION CONTROL <br />1.00 <br />LUMPSUM <br />$1,000.00 <br />$1,000.00 <br />0040. <br />TEMPORARY STRIPING <br />1.00 <br />LUMPSUM <br />$500.00 <br />$500.00 <br />0050. <br />FLAGGERS <br />150.00 <br />HOUR <br />$40.00 <br />$6,000.00 <br />0060. <br />REMOVAL OF CATCH BASINS <br />2.00 <br />EACH <br />$500.00 <br />$1,000.00 <br />0070. <br />REMOVAL OF MANHOLES <br />1.00 <br />EACH <br />$1,500.00 <br />$1,500.00 <br />0080. <br />MAJOR ADJUSTMENT OF MANHOLES <br />1.00 <br />EACH <br />$2,000.00 <br />$2,000.00 <br />0090. <br />10 INCH PVC PIPE <br />125.00 <br />FOOT <br />$55.00 <br />$6,875.00 <br />0100. <br />12 INCH PVC PIPE <br />46.00 <br />FOOT <br />$65.00 <br />$2,990.00 <br />0110. <br />10 INCH C900 PIPE <br />111.00 <br />FOOT <br />$50.00 <br />$5,550.00 <br />0120. <br />10 INCH CONCRETE PIPE <br />10.00 <br />FOOT <br />$55.00 <br />$550.00 <br />0130. <br />12 INCH CONCRETE PIPE <br />15.00 <br />FOOT <br />$65.00 <br />$975.00 <br />0140. <br />18 INCH CONCRETE PIPE <br />20.00 <br />FOOT <br />$75.00 <br />$1,500.00 <br />0150. <br />PIPE TEES, 10" X 4" <br />1.00 <br />EACH <br />$100.00 <br />$100.00 <br />0160. <br />PIPE TEES, 12" X 4" <br />1.00 <br />EACH <br />$150.00 <br />$150.00 <br />0170. <br />PIPE TEES, 18" X 10" <br />1.00 <br />EACH <br />$250.00 <br />$250.00 <br />0180. <br />CATCH BASINS WITH BIKE PROOF GRATE <br />2.00 <br />EACH <br />$1,500.00 <br />$3,000.00 <br />0190. <br />CONCRETE MANHOLE, FLAT TOP <br />2.00 <br />EACH <br />$2,500.00 <br />$5,000.00 <br />0200. <br />CATCH BASIN TRAP <br />2.00 <br />EACH <br />$300.00 <br />$600.00 <br />0210. <br />FILLING ABANDONED PIPES <br />18.00 <br />CUYD <br />$175.00 <br />$3,150.00 <br />0220. <br />PLUG PIPE, 6" <br />1.00 <br />EACH <br />$250.00 <br />$250.00 <br />0230. <br />PLUG PIPE, 10" <br />2.00 <br />EACH <br />$300.00 <br />$600.00 <br />0240. <br />PLUG PIPE, 12" <br />2.00 <br />EACH <br />$325.00 <br />$650.00 <br />0250. <br />PLUG PIPE, 15" <br />2.00 <br />EACH <br />$350.00 <br />$700.00 <br />0260. <br />REPAIR PIPE, REGROUT FROM INTERIOR <br />1.00 <br />LUMPSUM <br />$500.00 <br />$500.00 <br />0270. <br />REPAIR PIPE, REMOVE TAP <br />1.00 <br />LUMPSUM <br />$1,000.00 <br />$1,000.00 <br />0280. <br />LEVEL 3,1/211, DENSE, HMAC <br />105.00 <br />TON <br />$120.00 <br />$12,600.00 <br />0290. <br />PLAIN CONCRETE PVMT, DOWELED, 8 IN. THICK <br />1,220.00 <br />SQFT <br />$30.00 <br />$36,600.00 <br />0300. <br />PLAIN CONCRETE PVMT, DOWELED, IMPACT PANEL <br />15.00 <br />SQFT <br />$40.00 <br />$600.00 <br />0310. <br />CONCRETE CURB AND GUTTER <br />25.00 <br />FOOT <br />$45.00 <br />$1,125.00 <br />0320. <br />CONCRETE WALKS, 4" THICK <br />210.00 <br />SQFT <br />$15.00 <br />$3,150.00 <br />0330. <br />PAINTED PERMANENT PVMT STRIPING <br />100.00 <br />FOOT <br />$5.00 <br />$500.00 <br />0340. <br />BI-DIRECTIONAL YELLOW TYPE I MARKERS <br />10.00 <br />EACH <br />$25.00 <br />$250.00 <br />0350. <br />MONO-DIRECTIONAL CRYSTAL TYPE I MARKERS <br />10.00 <br />EACH <br />$25.00 <br />$250.00 <br />Total <br />General <br />$118,465.00 <br />Total : PPP <br />2010 STORM REHAB <br />$118,465.00 <br />Total : PPP 2010 Storm Rehab $118,465.00 <br />