New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4669 Anderson Erosion 2010-00013
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2010
>
GJN4669 Anderson Erosion 2010-00013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2014 3:34:18 PM
Creation date
2/23/2010 9:19:53 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
Yes
External_View
No
GJN
004669
GL_Project_Number
905502
COE_Contract_Number
2010-00013
Retention_Destruction_Date
3/13/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(b) Those portions lying east of a line running North <br />and South from the NE corner of Coos County to <br />the SE corner of Lincoln County. <br />(c) South half <br />(d) North half <br />ELEVATOR CONSTRUCTOR INSTALLER <br />AND MECHANIC <br />Area 1 <br />Mechanic 42.91 18.29 <br />Area 2 <br />Mechanic 43.09 18.29 <br />Reference Cities <br />Zone 1: Projects within 45 miles of city hall in the <br />cities listed below. <br />Zone 2: More than 45 miles, but less than 60 miles. <br />Zone 3: More than 60 miles, but less than 100 miles. <br />Zone 4: More than 100 miles. <br />Note: Zone pay for Ironworkers shall be determined using <br />AAA road mileage computed from the city hall of the <br />reference cities listed below or the residence of the <br />employee, whichever is nearer to the project. <br />Reference Cities <br />Medford Portland <br />LABORER <br />Zone 1 Base Rate <br />Area 1 <br />Area 2 <br />Group 1 <br />24.66 <br />11.15 <br />Group 2 <br />25.29 <br />11.15 <br />Baker <br />All <br />Group 3 <br />25.75 <br />11.15 <br />Umatilla <br />Remaining <br />Group 4 <br />26.15 <br />11.15 <br />Union <br />Counties <br />Group 5 <br />21.51 <br />11.15 <br />Wallowa <br />FLAGGER See Laborer, Group 5 <br />GLAZIER 30.30 14.33 <br />Add $1.00 to base rate if safety belt is required by <br />State safety regulations. <br />Add $4.00 to base rate for work done from a non- <br />motorized single-man bosun chair. <br />HIGHWAY/PARKING STRIPER <br />28.27 8.27 <br />IRONWORKER 33.12 17.40 <br />Zone Differential for Ironworker <br />(Add to Basic Hourly Rate) <br />Zone 1 0.00 <br />Zone 2 3.75 hr. or $30.00 maximum per day <br />Zone 3 6.88 hr or $55.00 maximum per day <br />Zone 4 8.75 hr. or $70.00 maximum per day <br />Note: A Hazardous Waste Removal Differential must be <br />added to the base rate if work is performed inside the <br />boundary of a Federally Designated Hazardous Waste Site. <br />A Group 1 base rate is used for General Laborer on such a <br />site. For further information on this, call the Prevailing <br />Wage Rate Coordinator at (971) 673-0839. <br />Zone Differential for Laborers <br />(Add to Zone 1 Rate) <br />Zone 2 <br />.65 <br />Zone 3 <br />1.15 <br />Zone 4 <br />1.70 <br />Zone 5 <br />2.75 <br />Zone 1: Projects within 30 miles of city hall in the <br />cities listed below. <br />Zone 2: More than 30 miles but less than 40 miles. <br />Zone 3: More than 40 miles but less than 50 miles. <br />Zone 4: More than 50 miles but less than 80 miles. <br />Zone 5: More than 80 miles. <br />Reference Cities <br />Albany <br />Burns <br />Hermiston <br />Portland <br />Astoria <br />Coos Bay <br />Klamath Falls <br />Roseburg <br />Baker City <br />Eugene <br />Medford <br />Salem <br />Bend <br />Grants Pass <br />Newport <br />The Dalles <br />JULY 1, 2009 P.. 40 <br />APPENDIX <br />ELECTRICIAN (Continued) IRONWORKER (Continued) <br />
The URL can be used to link to this page
Your browser does not support the video tag.