New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4669 Anderson Erosion 2010-00013
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2010
>
GJN4669 Anderson Erosion 2010-00013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2014 3:34:18 PM
Creation date
2/23/2010 9:19:53 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
Yes
External_View
No
GJN
004669
GL_Project_Number
905502
COE_Contract_Number
2010-00013
Retention_Destruction_Date
3/13/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
APPENDIX <br />JULY 1, 2009 <br />NOTE. THE APPENDIX SECTION IS TO BE USED ONLY FOR REGIONS/TRADES SPECIFIED <br />IN PAGES 6 THROUGH 33. REFER TO PAGES 6 THROUGH 33 BEFORE USING RATES IN <br />THIS SECTION. <br />Asbestos Worker/Insulator 36 <br />Boilermaker <br />36 <br />Bricklayer/Stonemason <br />36 <br />Bridge and Highway Carpenter (See Carpenter Group 5) <br />36-37 <br />Carpenter Group 1 & 2 <br />36-37 <br />Cement Mason <br />37 <br />Diver <br />37-38 <br />Divers' Tender <br />37-38 <br />Dredger <br />38 <br />Drywall,.Lather, Acoustical Carpenter & Ceiling Installer <br />39 <br />Drywall Taper (See Painter) <br />41-42 <br />Electrician <br />39-40 <br />Elevator Constructor, Installer and Mechanic <br />40 <br />Flagger (See Laborer Group 5) <br />40 <br />Glazier <br />40 <br />Highway/Parking Striper <br />. <br />Ironworker <br />40 <br />Laborer <br />40-41 <br />Limited Energy Electrician <br />41 <br />Line Constructor <br />41 <br />Marble Setter <br />41 <br />Millwright Group 1 & 2 (See Carpenter Group 3 & 4) <br />36-37 <br />Painter and Drywall Taper <br />41-42 <br />Piledriver (See Carpenter Group 6) <br />36-37 <br />Plasterer and Stucco Mason <br />42 <br />Plumber/Pipefitter/Steamfitter <br />42 <br />Power Equipment Operator <br />42-43 <br />Roofer <br />43-44 <br />Sheet Metal Worker <br />44 <br />Soft Floor Layer <br />44 <br />Sprinkler Fitter <br />.....44 <br />Tender to Mason Trades (Brick and Stonemason, Mortar Mixer, Hod Carrier)....... <br />44 <br />Tender to Plasterer and Stucco Mason <br />44 <br />Tile Setter/Terrazzo Worker: Hard Tile Setter <br />44 <br />Tile, Terrazzo, and Marble Finisher <br />44 <br />Truck Driver <br />44-45 <br />MAP: Power Equipment Operator, Zone 1 46 <br />PAGE 35 JULY 1, 2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.