New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4669 Anderson Erosion 2010-00013
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2010
>
GJN4669 Anderson Erosion 2010-00013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2014 3:34:18 PM
Creation date
2/23/2010 9:19:53 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
Yes
External_View
No
GJN
004669
GL_Project_Number
905502
COE_Contract_Number
2010-00013
Retention_Destruction_Date
3/13/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITYOFEUGENE: <br />PROPOSAL" <br />JANUARY 10, 2010, 2:00 P.M. <br />TO THE CITY MANAGER <br />EUGENE, OREGON <br />JOB #4669 BID NUMBER 31 <br />BIDDER: ANoF-R5oN'S f_?051o 1A CoWI,OL 1Rc, <br />The undersigned Bidder declares: <br />That Bidder has carefully examined and incorporates in this Proposal, by this reference all documents included <br />in the Book of Contract Documents and Specifications for this job which includes but is not limited to the Plans, City <br />Standard Specifications and Standard Drawings, Supplemental Specifications and Special Provisions, and City of Eugene <br />Amendment #1, Addenda, Bid Schedule, Prevailing Wage Rates, Contract Form, and Bond Form for <br />DELTA PONDS RIPARIAN PLANTING <br />CAPITAL IMPROVEMENT PROJECT <br />That Bidder has made an examination of the site of the proposed work and has made such investigations as are <br />necessary to determine the character of the material and the conditions to be encountered, independently ofthe indication <br />on the plans; and that if the Proposal is accepted, Bidder will contract with the City of Eugene as provided in the Contract <br />Form, will to the extent of this bid, provide the necessary machinery, tools, apparatus, and other means of construction, <br />and will furnish all material and labor as specified, or called for by the Plans or necessary to complete the work in the <br />manner specified and in accordance with the requirements of the Engineer. <br />The undersigned also agrees that Bidder will order all material and equipment included under this contract and <br />will commence work within five (5) days after receipt of Notice to Proceed and that Bidder will complete the work in all <br />respects after commencement and will have the project completed as specified in the Special Provisions and that Bidder <br />will pay as liquidated damages to the City for any delay as specified in the Special Provisions. <br />PROPOSAL-JOB #4669 PACE 1 of3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.