New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4669 Anderson Erosion 2010-00013
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2010
>
GJN4669 Anderson Erosion 2010-00013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2014 3:34:18 PM
Creation date
2/23/2010 9:19:53 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
Yes
External_View
No
GJN
004669
GL_Project_Number
905502
COE_Contract_Number
2010-00013
Retention_Destruction_Date
3/13/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PREFACE <br />The "Davis-Bacon Wage Determinations" and the Oregon Bureau of <br />Labor and Industries (BOLI) "Prevailing Wage Rates for Public <br />Works Contracts in Oregon subject to BOTH the State PWR and <br />federal Davis-Bacon Act" apply to this Project. <br />The wage rate and fringe benefits listed in this "Davis-Bacon <br />Wage Determinations for Highway Construction Projects" shall be <br />paid unless a higher wage rate and fringe benefits is listed in <br />the Oregon Bureau of Labor and Industries (BOLI) "Prevailing Wage <br />Rates for Public Works Contracts in Oregon subject to BOTH the <br />State PWR and federal Davis-Bacon Act", in which case, the higher <br />wage rate and fringe benefits shall be paid (see ORS 279C.838). <br />The BOLI publication is a separate document and is incorporated <br />into this Project by reference. <br />
The URL can be used to link to this page
Your browser does not support the video tag.