Run Date: 02/10/2010 15:34:21 <br />City of Eugene <br />Esti <br />mate Distribu <br />tion <br />Estimate: Pre-Bid Estimate <br />Job 93-004687 WW REHAB 2011 VARIOUS LOCATIONS <br />Line No. Description <br />Quantity <br />Unit <br />Unit Price <br />Amount <br />WW REHAB 2011 VARIOUS LOCATIONS <br />General <br />0010. MOBILIZATION <br />1.00 <br />LUMPSUM <br />$24,880.89 <br />$24,880.89 <br />0020. Project Construction <br />1.00 <br />EACH <br />$1,742,720.00 <br />$1,742,720.00 <br />0030. EROSION CONTROL <br />LUMPSUM <br />0040. TEMP. PROTECTION AND DIRECTION OF TRAFFIC <br />LUMPSUM <br />Total : General <br />$1,767,600.89 <br />Total : WW REHAB 2011 VARIOUS LOCATIONS <br />$1,767,600.89 <br />WW REHAB 2011 VARIOUS LOCATIONS - Other / Direct <br />General <br />0010. test <br />1.00 <br />LUMPSUM <br />$2,500.00 <br />$2,500.00 <br />0020. Contingency <br />10% of Cont <br />ract <br />$176,760.09 <br />0030. Advertising <br />1.00 <br />LUMPSUM <br />$400.00 <br />$400.00 <br />0040. Permits <br />1.00 <br />LUMPSUM <br />$300.00 <br />$300.00 <br />Total : General <br />$179,960.09 <br />Total : WW REHAB 2011 VARIOUS LOCATIONS - Other / Direct <br />$179,960.09 <br />WW REHAB 2011 VARIOUS LOCATIONS - Miscellaneous <br />General <br />0010. PSF CHARGES TO DATE (FOR EST) <br />1.00 <br />LUMPSUM <br />$1,000.00 <br />$1,000.00 <br />0020. PSF REMAINDER OF PROJ (FOR EST) <br />23% of Dire <br />ct <br />$447,939.03 <br />0030. AS-CONST. 11MONTH WARRANTY CHARGE <br />1.00 <br />LUMPSUM <br />$3,500.00 <br />$3,500.00 <br />Total : General <br />$452,439.03 <br />Total WW REHAB 2011 VARIOUS LOCATIONS - Miscellaneous <br />$452,439.03 <br />Total Pre-Bid Estimate <br />$2,400,000.01 <br />71U. <br />tiv <br />a F' <br />