New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4618 ODOT2009-00260
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2010
>
GJN4618 ODOT2009-00260
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2014 3:06:47 PM
Creation date
2/19/2010 10:33:59 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
Yes
External_View
No
GJN
004618
GL_Project_Number
995864
COE_Contract_Number
2009-00260
GL_Grant
667
Retention_Destruction_Date
12/10/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Misc. Contracts and Agreements No. 25659 <br />Cross Ref. Master Certification Agreement No. 24651 <br />AMENDMENT NO. 1 <br />Oregon Department of Transportation <br />LOCAL AGENCY CERTIFICATION PROGRAM <br />American Recovery and Reinvestment Act of 2009 <br />Supplemental Project Agreement No. 25659 <br />West First Avenue: Seneca Road - Bertelsen Road <br />City of Eugene <br />The STATE OF OREGON, acting by and through its Department of Transportation, <br />hereinafter referred to as "State"; and CITY OF EUGENE, acting by and through its <br />designated officials, hereinafter referred to as "Agency", entered into Local Agency <br />Supplemental Project Agreement No. 25659 on May 29, 2009. Said Agreement covers <br />the construction of pavement overlay on West First Avenue from Seneca Road to <br />Bertelsen Road, hereinafter referred to as "Project". <br />It has now been determined by State and Agency that the Agreement referenced above, <br />shall be amended to correct inconsistencies in the Agreement language, remove ARRA <br />construction phase funds, and reduce the total Preliminary Engineering (PE) phase ARRA <br />funding by $88,000. The $88,000 will be applied to Agency's 11th Avenue and 13th Avenue <br />Paving ARRA contingency project, Agreement No. 26415. <br />ARRA funds designated for construction of the Project, totaling $998,000, were combined <br />into Agency's 2010 Pavement Preservation Program: Garfield Street, High Street, <br />Crescent Avenue and West First Avenue project (ODOT Key No. 16427), as defined in <br />Agreement No. 25565. This Amendment will address the reduction of ARRA funds <br />designated for the PE phase. Except as expressly amended below, all other terms and <br />conditions of the Agreement are still in full force and effect. <br />TERMS OF AGREEMENT, Paragraph 2, Page 2, which reads: <br />2. Under such authority, Agency agrees to perform construction of pavement overlay on <br />West First Avenue from Seneca Road to Bertelsen Road, hereinafter referred to as <br />"Project". The location of the Project is shown on the sketch map attached hereto, <br />marked "Exhibit A", and by this reference made a part hereof. <br />Shall be deleted in its entirety and replaced with the following: <br />2. Under such authority, Agency agrees to perform preliminary engineering for Agency's <br />pavement overlay on West First Avenue from Seneca Road to Bertelsen Road, <br />hereinafter referred to as "Project". The location of the Project is shown on the map <br />attached hereto, marked "Exhibit A", and by this reference made a part hereof. <br />Key No. 16429 <br />
The URL can be used to link to this page
Your browser does not support the video tag.