Run Date: 02/08/2010 15:30:50 <br />City of Eugene <br />Est <br />imate Distribution <br />Estimate: <br />PPP DANEBO; ROYAL - W11TH-Final <br />Job <br />93-004348 PPP DANEBO; ROYAL - W 11TH AVE <br />Line No. Description <br />Quantity <br />Unit <br />Unit Price <br />Amount <br />PPP DANEBO; <br />ROYAL - W 11TH AVE <br />Genera <br />l <br />0010. <br />MOBILIZATION <br />1.00 <br />LUMPSUM <br />$37,500.00 <br />$37,500.00 <br />0020. <br />TEMP. WORK ZONE TRAFFIC CONTROL, COMPLETE <br />1.00 <br />LUMPSUM <br />$10,000.00 <br />$10,000.00 <br />0030. <br />TEMPORARY STRIPING <br />1.00 <br />LUMPSUM <br />$4,700.00 <br />$4,700.00 <br />0040. <br />PORTABLE CHANGEABLE MESSAGE SIGNS <br />2.00 <br />EACH <br />$3,500.00 <br />$7,000.00 <br />0050. <br />FLAGGERS <br />579.00 <br />HOUR <br />$44.00 <br />$25,476.00 <br />0060. <br />RAILROAD FLAGGERS <br />49.50 <br />HOUR <br />$100.00 <br />$4,950.00 <br />0070. <br />CITY PROVIDED SPEC INFO SIGNS <br />4.00 <br />EACH <br />$150.00 <br />$600.00 <br />0080. <br />EROSION CONTROL <br />1.00 <br />LUMPSUM <br />$1,000.00 <br />$1,000.00 <br />0090. <br />ADJUSTING BOXES <br />32.00 <br />EACH <br />$225.00 <br />$7,200.00 <br />0100. <br />MINOR ADJUSTMENT OF MANHOLES <br />33.00 <br />EACH <br />$1,000.00 <br />$33,000.00 <br />0110. <br />MH REM/REPL FRAME/COVER-WW <br />11.00 <br />EACH <br />$260.00 <br />$2,860.00 <br />0120. <br />MH REM/REPL FRAME/COVER-ST <br />13.00 <br />EACH <br />$260.00 <br />$3,380.00 <br />0130. <br />REPAIR CURB INLET WALL <br />2.00 <br />EACH <br />$525.00 <br />$1,050.00 <br />0131. <br />ADDITIONAL CURB INLET REPAIR 001 <br />1.00 <br />LUMPSUM <br />$326.64 <br />$326.64 <br />0140. <br />COLD PLANE PVMT REMOVAL, TAPER 1" TO 2" DEEP <br />0.00 <br />SQFT <br />$0.40 <br />$0.00 <br />0150. <br />COLD PLANE PVMT REMOVAL, 2" DEEP <br />91,124.00 <br />SQFT <br />$0.17 <br />$15,491.08 <br />0160. <br />COLD PLANE PVMT REMOVAL, 3" DEEP <br />153,415.00 <br />SQFT <br />$0.14 <br />$21,478.10 <br />0170. <br />COLD PLANE PVMT REMOVAL, 4" DEEP <br />51,425.00 <br />SQFT <br />$0.11 <br />$5,656.75 <br />0180. <br />LEVEL 3, 1/2" DENSE WMAC <br />5,850.13 <br />TON <br />$50.00 <br />$292,506.50 <br />0181. <br />AC DE-ESCALATION ADJ-MAY 002 <br />5,850.13 <br />TON <br />($1.71) <br />($10,003.72) <br />0190. <br />ASPHALT CONCRETE PAVEMENT REPAIR <br />533.77 <br />CUYD <br />$60.00 <br />$32,026.20 <br />0200. <br />CONCRETE WIDE CURB AND GUTTER <br />289.60 <br />FT <br />$50.00 <br />$14,480.00 <br />0201. <br />REINFORCEMENT 001 <br />1.00 <br />LUMPSUM <br />$313.74 <br />$313.74 <br />0210. <br />PVMT LEGEND, TYPE Al OR A2: ARROWS <br />8.00 <br />EACH <br />$135.00 <br />$1,080.00 <br />0220. <br />PVMT LEGEND, TYPE Al OR A2: RR XING <br />2.00 <br />EACH <br />$950.00 <br />$1,900.00 <br />0230. <br />PVMT LEGEND, TYPE Al OR A2: BIKE RR XING <br />2.00 <br />EACH <br />$650.00 <br />$1,300.00 <br />0240. <br />PVMT LEGEND, TYPE Al OR A2: BICYCLE LANE SYMB <br />5.00 <br />EACH <br />$145.00 <br />$1,160.00 <br />0250. <br />PVMT LINE, TYPE A2 OR B <br />478.50 <br />SQFT <br />$4.00 <br />$1,914.00 <br />0260. <br />MONO-DIRECTIONAL CRYSTAL TYPE I MARKERS <br />32.00 <br />EACH <br />$5.00 <br />$160.00 <br />0270. <br />BI-DIRECTIONAL YELLOW TYPE I MARKERS <br />390.00 <br />EACH <br />$5.00 <br />$1,950.00 <br />0280. <br />THERMOPLASTIC, NON-PROFILE, 90 MIL, EXTRUDED <br />1.00 <br />LUMPSUM <br />$38,500.00 <br />$38,500.00 <br />0290. <br />LOOP DETECTORS INSTALLATION <br />30.00 <br />EACH <br />$520.00 <br />$15,600.00 <br />0300. <br />PERMANENT VIDEO DETECTION INSTALLATION <br />1.00 <br />EACH <br />$8,600.00 <br />$8,600.00 <br />0310. <br />CONDUIT UNDER HARD SURFACING <br />8.00 <br />FT <br />$90.00 <br />$720.00 <br />0320. <br />LOOP FEEDER WIRE <br />728.00 <br />FT <br />$1.30 <br />$946.40 <br />0330. <br />REMOVE AND REINSTALL LOOP FEEDER WIRE <br />1.00 <br />LUMPSUM <br />$250.00 <br />$250.00 <br />0331. <br />REMOVE PIPE 001 <br />1.00 <br />LUMPSUM <br />$164.81 <br />$164.81 <br />Total <br />General <br />$585,236.50 <br />Total : PPP <br />DANEBO; ROYAL - W 11TH AVE <br />$585,236.50 <br />PPP DANEBO; <br />ROYAL - W 11TH AVE - Other / Direct <br />General <br />0010. <br />CONTINGENCY <br />OAS of Contract <br />$0.00 <br />0020. <br />PAVEMENT TESTING <br />1.00 <br />EACH <br />$5,702.43 <br />$5,702.43 <br />0030. <br />Advertising <br />1.00 <br />LUMPSUM <br />$316.05 <br />$316.05 <br />0040. <br />Printing <br />1.00 <br />LUMPSUM <br />$346.48 <br />$346.48 <br />0050. <br />Administration <br />1.00 <br />LUMPSUM <br />$630.33 <br />$630.33 <br />Total <br />: General <br />$6,995.29 <br />Total : PPP <br />DANEBO; ROYAL - W 11TH AVE - Other / Direct <br />$6,995.29 <br />PPP DANEBO; <br />ROYAL - W 11TH AVE - Miscellaneous <br />General <br />0010. <br />Engineering Charge <br />1.00 <br />LUMPSUM <br />$97,569.90 <br />$97,569.90 <br />0020. <br />AS-CONST. 11MONTH WARRANTY CHARGE <br />1.00 <br />LUMPSUM <br />$1,500.00 <br />$1,500.00 <br />Total : <br />General <br />$99,069.90 <br />Total : PPP <br />DANEBO; ROYAL - W 11TH AVE - Miscellaneous <br />$99,069.90 <br />Total : PPP DANEBO; ROYAL - W11TH-Final $691,301.69 <br />