Run Date: 02/08/2010 15:28:33 <br />Estimate: 4560 PPP ROYAL WRITE-TERRY-FINAL <br />Job 93-004560 PPP ROYAL AVE <br />Line No. Description <br />PPP ROYAL AVE <br />General <br />City of Eugene <br />Estimate Distribution <br />Quantity Unit Unit Price <br />mount <br />0350. <br />MOBILIZATION <br />1.00 <br />LUMPSUM <br />$40,000.00 <br />$40,000.00 <br />0360. <br />TEMP. WORK ZONE TRAFFIC CONTROL, COMPLETE <br />1.00 <br />LUMPSUM <br />$10,000.00 <br />$10,000.00 <br />0361. <br />INSTALL PCMS'S 001 <br />2.00 <br />EACH <br />$3,500.00 <br />$7,000.00 <br />0370. <br />TEMPORARY STRIPING <br />1.00 <br />LUMPSUM <br />$6,000.00 <br />$6,000.00 <br />0380. <br />FLAGGERS <br />845.50 <br />HOUR <br />$44.00 <br />$37,202.00 <br />0390. <br />CITY PROVIDED SPEC INFO SIGNS <br />4.00 <br />EACH <br />$150.00 <br />$600.00 <br />0400. <br />SPECIAL SIGNS <br />96.00 <br />SQFT <br />$35.00 <br />$3,360.00 <br />0410. <br />EROSION CONTROL <br />1.00 <br />LUMPSUM <br />$1,000.00 <br />$1,000.00 <br />0420. <br />ADJUSTING BOXES <br />13.00 <br />EACH <br />$225.00 <br />$2,925.00 <br />0430. <br />MINOR ADJUSTMENT OF MANHOLES <br />54.00 <br />EACH <br />$1,000.00 <br />$54,000.00 <br />0440. <br />REM/REPL FRAME/COVER-WW <br />24.00 <br />EACH <br />$260.00 <br />$6,240.00 <br />0450. <br />REM/REPL FRAME/COVER-ST <br />15.00 <br />EACH <br />$260.00 <br />$3,900.00 <br />0460. <br />REMOVAL OF INLETS <br />0.00 <br />EACH <br />$250.00 <br />$0.00 <br />0470. <br />CONCRETE INLETS, TYPE 4A <br />0.00 <br />EACH <br />$1,350.00 <br />$0.00 <br />0480. <br />POUR CURB INLET BOTTOM <br />0.00 <br />EACH <br />$300.00 <br />$0.00 <br />0490. <br />REPLACE 10" CONCRETE PIPE <br />6.50 <br />FT <br />$50.00 <br />$325.00 <br />0500. <br />ASPHALT CONCRETE PAVEMENT REPAIR <br />374.13 <br />CUYD <br />$70.00 <br />$26,189.10 <br />0510. <br />PAVEMENT REMOVAL <br />84.00 <br />SQFT <br />$9.00 <br />$756.00 <br />0520. <br />COLD PLANE PVMT REMOVAL, 2" DEEP <br />100,705.20 <br />SQFT <br />$0.16 <br />$16,112.83 <br />0530. <br />COLD PLANE PVMT REMOVAL, 4" DEEP <br />214,319.20 <br />SQFT <br />$0.16 <br />$34,291.07 <br />0540. <br />LEVEL 3, 1/2" DENSE WMAC <br />6,793.41 <br />TON <br />$50.00 <br />$339,670.50 <br />0541. <br />AC DE-ESCALATION ADJ-MAY 002 <br />2,543.38 <br />EACH <br />($1.71) <br />($4,349.18) <br />0542. <br />AC DE-ESCLATION ADJ-JUNE 002 <br />4,250.03 <br />EACH <br />($0.76) <br />($3,230.02) <br />0550. <br />STANDARD CONCRETE CURBS <br />34.20 <br />FOOT <br />$18.00 <br />$615.60 <br />0560. <br />CONCRETE CURB AND GUTTER <br />28.40 <br />FOOT <br />$43.00 <br />$1,221.20 <br />0570. <br />CONCRETE WALKS. <br />485.90 <br />SQFT <br />$8.00 <br />$3,887.20 <br />0580. <br />TRUNCATED DOME TEXTURING <br />82.00 <br />SQFT <br />$24.00 <br />$1,968.00 <br />0590. <br />PVMT LEGEND, TYPE A2: ARROWS <br />14.00 <br />EACH <br />$135.00 <br />$1,890.00 <br />0600. <br />PVMT LEGEND, TYPE A2: BICYCLE LANE SYMBOLS <br />15.00 <br />EACH <br />$135.00 <br />$2,025.00 <br />0610. <br />PVMT LEGEND, TYPE A2: STOP <br />4.00 <br />EACH <br />$200.00 <br />$800.00 <br />0620. <br />PVMT LINE, TYPE A2 OR B <br />1,101.50 <br />SQFT <br />$4.00 <br />$4,406.00 <br />0621. <br />REMOVE CROSSWALK MARKINGS 001 <br />1.00 <br />EACH <br />$378.00 <br />$378.00 <br />0630. <br />MONO-DIRECTIONAL CRYSTAL TYPE I MARKERS <br />52.00 <br />EACH <br />$5.00 <br />$260.00 <br />0640. <br />BI-DIRECTIONAL YELLOW TYPE I MARKERS <br />359.00 <br />EACH <br />$5.00 <br />$1,795.00 <br />0650. <br />THERMOPLASTIC, NON-PROFILE, 90 MIL, EXTRUDED <br />1.00 <br />LUMPSUM <br />$34,000.00 <br />$34,000.00 <br />0680. <br />LOOP DETECTORS INSTALLATION <br />47.00 <br />EACH <br />$520.00 <br />$24,440.00 <br />0681. <br />INSTALL ADDITIONAL LOOP WIRE 001 <br />1.00 <br />LUMPSUM <br />$2,216.16 <br />$2,216.16 <br />0690. <br />JUNCTION BOX, TYPE 1 <br />3.00 <br />EACH <br />$500.00 <br />$1,500.00 <br />0700. <br />ADJUST JUNCTION BOX <br />0.31 <br />EACH <br />$475.00 <br />$147.25 <br />0701. <br />LOWER JUNCTION BOX TO GRADE 001 <br />1.00 <br />LUMPSUM <br />$487.29 <br />$487.29 <br />0710. <br />CONDUIT UNDER HARD SURFACING <br />62.00 <br />FT <br />$90.00 <br />$5,580.00 <br />0720. <br />LOOP FEEDER WIRE <br />1,567.00 <br />FT <br />$1.00 <br />$1,567.00 <br />0730. <br />REMOVE AND REINSTALL LOOP FEEDER WIRE <br />1.00 <br />LUMPSUM <br />$600.00 <br />$600.00 <br />Total <br />General <br />$671,776.00 <br />Total : PPP <br />ROYAL AVE <br />$671,776.00 <br />PPP ROYAL AVE - Other / Direct <br />General <br />0010. <br />Contingency <br />0W of Contract <br />$0.00 <br />0020. <br />test <br />1.00 <br />LUMPSUM <br />$7,804.64 <br />$7,804.64 <br />0030. <br />Printing <br />1.00 <br />LUMPSUM <br />$549.14 <br />$549.14 <br />0040. <br />Advertising <br />1.00 <br />LUMPSUM <br />$100.80 <br />$100.80 <br />0050. <br />Administration <br />1.00 <br />LUMPSUM <br />$713.04 <br />$713.04 <br />Total : <br />General <br />$9,167.62 <br />Total : PPP <br />ROYAL AVE - Other / Direct <br />$9,167.62 <br />