Run Date: 02/08/2010 15:28:33
<br />Estimate: 4560 PPP ROYAL WRITE-TERRY-FINAL
<br />Job 93-004560 PPP ROYAL AVE
<br />Line No. Description
<br />PPP ROYAL AVE
<br />General
<br />City of Eugene
<br />Estimate Distribution
<br />Quantity Unit Unit Price
<br />mount
<br />0350.
<br />MOBILIZATION
<br />1.00
<br />LUMPSUM
<br />$40,000.00
<br />$40,000.00
<br />0360.
<br />TEMP. WORK ZONE TRAFFIC CONTROL, COMPLETE
<br />1.00
<br />LUMPSUM
<br />$10,000.00
<br />$10,000.00
<br />0361.
<br />INSTALL PCMS'S 001
<br />2.00
<br />EACH
<br />$3,500.00
<br />$7,000.00
<br />0370.
<br />TEMPORARY STRIPING
<br />1.00
<br />LUMPSUM
<br />$6,000.00
<br />$6,000.00
<br />0380.
<br />FLAGGERS
<br />845.50
<br />HOUR
<br />$44.00
<br />$37,202.00
<br />0390.
<br />CITY PROVIDED SPEC INFO SIGNS
<br />4.00
<br />EACH
<br />$150.00
<br />$600.00
<br />0400.
<br />SPECIAL SIGNS
<br />96.00
<br />SQFT
<br />$35.00
<br />$3,360.00
<br />0410.
<br />EROSION CONTROL
<br />1.00
<br />LUMPSUM
<br />$1,000.00
<br />$1,000.00
<br />0420.
<br />ADJUSTING BOXES
<br />13.00
<br />EACH
<br />$225.00
<br />$2,925.00
<br />0430.
<br />MINOR ADJUSTMENT OF MANHOLES
<br />54.00
<br />EACH
<br />$1,000.00
<br />$54,000.00
<br />0440.
<br />REM/REPL FRAME/COVER-WW
<br />24.00
<br />EACH
<br />$260.00
<br />$6,240.00
<br />0450.
<br />REM/REPL FRAME/COVER-ST
<br />15.00
<br />EACH
<br />$260.00
<br />$3,900.00
<br />0460.
<br />REMOVAL OF INLETS
<br />0.00
<br />EACH
<br />$250.00
<br />$0.00
<br />0470.
<br />CONCRETE INLETS, TYPE 4A
<br />0.00
<br />EACH
<br />$1,350.00
<br />$0.00
<br />0480.
<br />POUR CURB INLET BOTTOM
<br />0.00
<br />EACH
<br />$300.00
<br />$0.00
<br />0490.
<br />REPLACE 10" CONCRETE PIPE
<br />6.50
<br />FT
<br />$50.00
<br />$325.00
<br />0500.
<br />ASPHALT CONCRETE PAVEMENT REPAIR
<br />374.13
<br />CUYD
<br />$70.00
<br />$26,189.10
<br />0510.
<br />PAVEMENT REMOVAL
<br />84.00
<br />SQFT
<br />$9.00
<br />$756.00
<br />0520.
<br />COLD PLANE PVMT REMOVAL, 2" DEEP
<br />100,705.20
<br />SQFT
<br />$0.16
<br />$16,112.83
<br />0530.
<br />COLD PLANE PVMT REMOVAL, 4" DEEP
<br />214,319.20
<br />SQFT
<br />$0.16
<br />$34,291.07
<br />0540.
<br />LEVEL 3, 1/2" DENSE WMAC
<br />6,793.41
<br />TON
<br />$50.00
<br />$339,670.50
<br />0541.
<br />AC DE-ESCALATION ADJ-MAY 002
<br />2,543.38
<br />EACH
<br />($1.71)
<br />($4,349.18)
<br />0542.
<br />AC DE-ESCLATION ADJ-JUNE 002
<br />4,250.03
<br />EACH
<br />($0.76)
<br />($3,230.02)
<br />0550.
<br />STANDARD CONCRETE CURBS
<br />34.20
<br />FOOT
<br />$18.00
<br />$615.60
<br />0560.
<br />CONCRETE CURB AND GUTTER
<br />28.40
<br />FOOT
<br />$43.00
<br />$1,221.20
<br />0570.
<br />CONCRETE WALKS.
<br />485.90
<br />SQFT
<br />$8.00
<br />$3,887.20
<br />0580.
<br />TRUNCATED DOME TEXTURING
<br />82.00
<br />SQFT
<br />$24.00
<br />$1,968.00
<br />0590.
<br />PVMT LEGEND, TYPE A2: ARROWS
<br />14.00
<br />EACH
<br />$135.00
<br />$1,890.00
<br />0600.
<br />PVMT LEGEND, TYPE A2: BICYCLE LANE SYMBOLS
<br />15.00
<br />EACH
<br />$135.00
<br />$2,025.00
<br />0610.
<br />PVMT LEGEND, TYPE A2: STOP
<br />4.00
<br />EACH
<br />$200.00
<br />$800.00
<br />0620.
<br />PVMT LINE, TYPE A2 OR B
<br />1,101.50
<br />SQFT
<br />$4.00
<br />$4,406.00
<br />0621.
<br />REMOVE CROSSWALK MARKINGS 001
<br />1.00
<br />EACH
<br />$378.00
<br />$378.00
<br />0630.
<br />MONO-DIRECTIONAL CRYSTAL TYPE I MARKERS
<br />52.00
<br />EACH
<br />$5.00
<br />$260.00
<br />0640.
<br />BI-DIRECTIONAL YELLOW TYPE I MARKERS
<br />359.00
<br />EACH
<br />$5.00
<br />$1,795.00
<br />0650.
<br />THERMOPLASTIC, NON-PROFILE, 90 MIL, EXTRUDED
<br />1.00
<br />LUMPSUM
<br />$34,000.00
<br />$34,000.00
<br />0680.
<br />LOOP DETECTORS INSTALLATION
<br />47.00
<br />EACH
<br />$520.00
<br />$24,440.00
<br />0681.
<br />INSTALL ADDITIONAL LOOP WIRE 001
<br />1.00
<br />LUMPSUM
<br />$2,216.16
<br />$2,216.16
<br />0690.
<br />JUNCTION BOX, TYPE 1
<br />3.00
<br />EACH
<br />$500.00
<br />$1,500.00
<br />0700.
<br />ADJUST JUNCTION BOX
<br />0.31
<br />EACH
<br />$475.00
<br />$147.25
<br />0701.
<br />LOWER JUNCTION BOX TO GRADE 001
<br />1.00
<br />LUMPSUM
<br />$487.29
<br />$487.29
<br />0710.
<br />CONDUIT UNDER HARD SURFACING
<br />62.00
<br />FT
<br />$90.00
<br />$5,580.00
<br />0720.
<br />LOOP FEEDER WIRE
<br />1,567.00
<br />FT
<br />$1.00
<br />$1,567.00
<br />0730.
<br />REMOVE AND REINSTALL LOOP FEEDER WIRE
<br />1.00
<br />LUMPSUM
<br />$600.00
<br />$600.00
<br />Total
<br />General
<br />$671,776.00
<br />Total : PPP
<br />ROYAL AVE
<br />$671,776.00
<br />PPP ROYAL AVE - Other / Direct
<br />General
<br />0010.
<br />Contingency
<br />0W of Contract
<br />$0.00
<br />0020.
<br />test
<br />1.00
<br />LUMPSUM
<br />$7,804.64
<br />$7,804.64
<br />0030.
<br />Printing
<br />1.00
<br />LUMPSUM
<br />$549.14
<br />$549.14
<br />0040.
<br />Advertising
<br />1.00
<br />LUMPSUM
<br />$100.80
<br />$100.80
<br />0050.
<br />Administration
<br />1.00
<br />LUMPSUM
<br />$713.04
<br />$713.04
<br />Total :
<br />General
<br />$9,167.62
<br />Total : PPP
<br />ROYAL AVE - Other / Direct
<br />$9,167.62
<br />
|