Run Date: 02/04/2010 10:41:26 <br />Contractor: BABB CONSTRUCTION <br />Job #: 93- 004546 <br />Contract No: 2009 -00030 <br />PO #: 2010100033 <br />Assessable: Yes <br />Line Description Last Chng Ord <br />Current Contract <br />Unit Price Unit Measure Quantity <br />Estimated Payment Cumulative Totals <br />Amount Quantity Amount Quantity Amount <br />Page 4 <br />% Complete <br />0301 <br />SMALL, IRREGULAR PAVEMENT REPL 001 <br />$137.50 <br />TON <br />25.000 <br />$3,437.50 <br />0.000 <br />$0.00 <br />25.000 <br />$3,437.50 <br />100.00 <br />0310 <br />CONCRETE CURBS (E =0 ") <br />$5.17 <br />FOOT <br />2,324.000 <br />$12,015.08 <br />0.000 <br />$0.00 <br />2,623.500 <br />$13,563.50 <br />113.00 <br />0320 <br />CONCRETE CURBS (E =6 ") <br />$8.01 <br />FOOT <br />997.000 <br />$7,985.97 <br />0.000 <br />$0.00 <br />613.200 <br />$4,911.73 <br />62.00 <br />0330 <br />CONCRETE CURB AND GUTTER <br />$12.41 <br />FOOT <br />251.000 <br />$3,114.91 <br />0.000 <br />$0.00 <br />242.000 <br />$3,003.22 <br />96.00 <br />0331 <br />REM /REPL 44.5 CURB NEAR LINCOL 002 <br />$446.09 <br />LUMPSUM <br />1.000 <br />$446.09 <br />0.000 <br />$0.00 <br />1.000 <br />$446.09 <br />100.00 <br />0332 <br />REMOVE /REPLACE MEDIANS AS DIRE 002 <br />$5,526.45 <br />LUMPSUM <br />1.000 <br />$5,526.45 <br />0.000 <br />$0.00 <br />1.000 <br />$5,526.45 <br />100.00 <br />0340 <br />TRAFFIC CIRCLE CONCRETE TRUCK <br />$19.74 <br />SQFT <br />34.000 <br />$671.16 <br />0.000 <br />$0.00 <br />137.400 <br />$2,712.28 <br />404.00 <br />0350 <br />CONCRETE DRIVEWAYS <br />$3.67 <br />SQFT <br />961.000 <br />$3,526.87 <br />0.000 <br />$0.00 <br />2,654.000 <br />$9,740.18 <br />276.00 <br />0360 <br />CONCRETE WALKS (4" THICK) <br />$2.97 <br />SQFT <br />6,403.000 <br />$19,016.91 <br />0.000 <br />$0.00 <br />6,146.500 <br />$18,255.11 <br />96.00 <br />0370 <br />CONCRETE WALKS (5" THICK) <br />$3.36 <br />SQFT <br />1,373.000 <br />$4,613.28 <br />0.000 <br />$0.00 <br />1,547.600 <br />$5,199.94 <br />113.00 <br />0380 <br />ADA TEXTURING <br />$16.00 <br />SQFT <br />74.000 <br />$1,184.00 <br />0.000 <br />$0.00 <br />92.000 <br />$1,472.00 <br />124.00 <br />0390 <br />REMOVAL OF EXISTING PAVEMENT M <br />$900.00 <br />LUMPSUM <br />1.000 <br />$900.00 <br />0.000 <br />$0.00 <br />1.000 <br />$900.00 <br />100.00 <br />0400 <br />PAINT MEDIAN /TRAFFIC CIRCLE CU <br />$2.80 <br />FOOT <br />365.000 <br />$1,022.00 <br />0.000 <br />$0.00 <br />140.000 <br />$392.00 <br />38.00 <br />0410 <br />PVMT LEGEND, TYPE A -2: SPEED T <br />$250.00 <br />EACH <br />6.000 <br />$1,500.00 <br />0.000 <br />$0.00 <br />6.000 <br />$1,500.00 <br />100.00 <br />0420 <br />PVMT LINE, TYPE A -2 <br />$8.95 <br />SQFT <br />25.000 <br />$223.75 <br />0.000 <br />$0.00 <br />45.000 <br />$402.75 <br />180.00 <br />0430 <br />BI- DIRECTIONAL YELLOW TYPE I M <br />$5.25 <br />EACH <br />50.000 <br />$262.50 <br />0.000 <br />$0.00 <br />60.000 <br />$315.00 <br />120.00 <br />0440 <br />THERMOPLASTIC, NON - PROFILE, 90 <br />$2,260.00 <br />LUMPSUM <br />1.000 <br />$2,260.00 <br />0.000 <br />$0.00 <br />1.000 <br />$2,260.00 <br />100.00 <br />0450 <br />REMOVE AND REINSTALL EXISTING <br />$2,800.00 <br />LUMPSUM <br />1.000 <br />$2,800.00 <br />0.000 <br />$0.00 <br />1.000 <br />$2,800.00 <br />100.00 <br />0460 <br />TYPE W1 SIGNS IN PLACE <br />$150.00 <br />EACH <br />5.000 <br />$750.00 <br />0.000 <br />$0.00 <br />9.000 <br />$1,350.00 <br />180.00 <br />0470 <br />TYPE Y1 SIGNS IN PLACE <br />$150.00 <br />EACH <br />11.000 <br />$1,650.00 <br />0.000 <br />$0.00 <br />10.000 <br />$1,500.00 <br />91.00 <br />0480 <br />SPEED TABLES /RAISED CROSSINGS <br />$5.10 <br />SQFT <br />1,796.000 <br />$9,159.60 <br />0.000 <br />$0.00 <br />1,794.400 <br />$9,151.44 <br />100.00 <br />0490 <br />ILLUMINATION <br />$11,545.00 <br />LUMPSUM <br />1.000 <br />$11,545.00 <br />0.000 <br />$0.00 <br />1.000 <br />$11,545.00 <br />100.00 <br />0500 <br />IRRIGATION SYSTEM <br />$8,000.00 <br />LUMPSUM <br />1.000 <br />$8,000.00 <br />0.000 <br />$0.00 <br />0.900 <br />$7,200.00 <br />90.00 <br />0510 <br />TOPSOIL <br />$20.00 <br />TON <br />300.000 <br />$6,000.00 <br />0.000 <br />$0.00 <br />281.730 <br />$5,634.60 <br />94.00 <br />City of Eugene <br />Contract Preliminary Progress Payment <br />Payment No : 007 <br />Original Contract: $2,120,407.20 <br />Current Amount: $2,152,442.84 <br />Contract Award Date: 07/02/2009 <br />Completion Date: 10/20/2010 <br />