Sourh Ramp ALOO01 <br />10/1/2009 <br />Estimate <br />Pre GJN <br />mill/overlay <br />100200 <br />sf <br />Unit <br />Unit <br />Qty <br />Cost <br />Total <br />mob-10% <br />Is <br />1 <br />$ <br />21,217 <br />$ <br />21,217 <br />Safety/Security <br />Is <br />1 <br />$ <br />20,000 <br />$ <br />20,000 <br />Erosion Control <br />Is <br />1 <br />$ <br />1,000 <br />$ <br />1,000 <br />mill - 20% <br />sy <br />1113 <br />$ <br />10 <br />$ <br />11,133 <br />2 5" HMAC <br />to <br />1578 <br />$ <br />65 <br />$ <br />102,580 <br />Subgrade Stabilization <br />sf <br />488 <br />$ <br />50 <br />$ <br />24,400 <br />Coal Tar 30% <br />sf <br />30060 <br />$ <br />1 <br />$ <br />30,060 <br />Adj Stm MH/AD <br />ea <br />4 <br />$ <br />1,000 <br />$ <br />4,000 <br />Tie Downs <br />ea <br />36 <br />$ <br />500 <br />$ <br />18,000 <br />Striping <br />sf <br />500 <br />$ <br />2 <br />$ <br />1,000 <br />$ <br />233,390 <br />contingency <br />10% <br />23,339.04 <br />field cores <br />5 ea <br />$ <br />1,000 <br />testing <br />$ <br />3,000 <br />engineering <br />15% <br />35,008.56 <br />TOTAL: <br />$ <br />295,738 <br />