. 7'7 .. ~ Per#vrate~ Drainage Pipe 8" ~1a1' +~ 0.4 LF. <br />78 TV lnspectian 0.0 L.F <br />~9 Drainage Pipe fi" D.4 LF <br />80 . Trench Safety Plates 0.4 Pi,_ATES <br />81 Construction Fencing 0.4 L,F <br />82 G" Concrete Pipe Caring 0, 0 EA <br />83 8" Concrete Pike Coring 0.0 EA <br />84 10" Concrete Pipe Coring 0.0 EA <br />85 Reject Sand a,a TN <br />86 5112" 3300# Concrete 0,4 SF <br />$7' MOblle Mixer 3304# [ranGrete 4.a4 CY <br />88 Loam a,a CY <br />89 2" Mulch 4.4 SY <br />94 CAD Delivery 0.0 HR <br />91 Rip Rap 50# 0.0 TN <br />92 Rip Rap 100# a,a TN <br />93 Rip Rap 2aa# a,a TN <br />94~ Filter FaSric 4.4 LF <br />95 Catch Basinllnlet Protection 0.4 EA <br />9fi Storm Sewer Manhole Frame & Cover 0.0 EA <br />9~ Sanitary Sewer Manhole Frame & Cover 0.0 EA <br />98 Asphalt Sawcutting, 3,517,0 IN-l.l; <br />99 Concrete Sawciatting, approx. 35 if @ 5" depth O.a IN-LF' <br />100 Salt Fencing 0.0 LF <br /> AMENDMENT #~ ITEMS <br />1 Asphalt Paving Machine Dlavv Knox l'F500 0.0 HR <br /> 1 <br />~~.ao <br />X1,10 <br />$2.55 <br />$100.aa <br />$0.7'0 <br />~2~0,00 <br />$300.04 <br />$33x.40 <br />~~.85 <br />$6.30 <br />~1~a.44 <br />$8.4a <br />X2.20 <br />$115.50 <br />$10.Oa <br />$1a,a0 <br />X10.00 <br />$0.60 <br />~sa.a4 <br />~3o0.oa <br />$300.00 <br />$0.23 <br />$0.75 <br />~a.75 <br />$164.aa <br />$4, 40 <br />$0.00 <br />~a.a4 <br />$4,a0 <br />~a,40 <br />$0,00 <br />$0.00 <br />~a. as <br />$4. a4 <br />$D, a0 <br />~4,aa <br />$a. 0a <br />$O.D4 <br />$4, a0 <br />$4.40 <br />~o,4a <br />~a,aa <br />~4,4a <br />~aDa <br />~a,40 <br />~o,4a <br />$808,91 <br />~a.oa <br />~a.aa <br />$0.00 <br />X0.00 <br />TOTAL ES&G WORK ................... $'tT,931.9'I <br />TC3TAL PR~JECT.~.....~,y., $17,931.91 <br />