Final Acceptance <br />Completion of Warranty Period <br />AT% lw'j Public Works <br />Engineering <br />99 East Broadway, Ste 400 <br />Eugene, OR 97401 <br />(541) 682-5291 <br />(541) 682-8410 <br />To: Emery and Sons Construction, Inc. Date: January 14, 2010 <br />PO BOX 398 <br />Stayton, OR 97383 From: Glen A. Fee <br />Project: POLK STREET WATER QUALITY VAULT <br />Contract Number: 2008-25 <br />Job Number: 3984 <br />A warranty inspection has been made on this project in accordance with Section 00150 of the <br />City Standard Specifications and Standard Drawings. <br />No defects were noted and/or were corrected the project is hereby accepted by the City for <br />permanent maintenance. <br />Engineer. <br />Address: <br />Owner. <br />Address: <br />FOR PRIVATELY ENGINEERED PROJECTS ONLY <br />Q:\PROJECTS\PROJ-4\3984\CORRESP\3984 20100114 Final Acceptance Completion of Warranty Period.doc <br />ENG 1122 Contractor File Engineer Owner Surety PW Admin Construction Manager Revised 4/04 <br />Finance/Accts Receivable for assessable projects or City Recorders Office for nonassessable projects f; /"1,f1 <br />