Maintenance Requirements <br />Facility Type <br />Annual Maintenance Actlvitles <br />CDS 240 Inspect sediment loading and debris accumulation, remove debris and <br />sediment. <br />Ayers Pond Outfall Retrofit N/A <br />CSWMP Objectives and Policies Addressed by the Capital Project <br />Flood Control <br />N/A <br />Water Quality <br />This CP will reduce the amount of debris transported through the open channel system, as well as to reduce the <br />erosion downstream of the outfall. <br />Natural Resources <br />Other City Objectives Addressed by the Capital Project <br />ro be completed by the City <br />Costs Construction Costs: $645,000 <br />Site Acquisition: $0 <br />Engineering /Administration: $129,000 <br />Capital Project Implementation Costs $774,000 <br />Annual Maintenance Costs $1,000 <br />