Run Date: 12/14/2009 12:29:37 City of Eugene <br />Estimate Distribution <br />Estimate: 4614 PPP High 3rd to 17th - KRC <br />Job 93-004614 PPP HIGH STREET FROM 3RD AVENUE TO 17TH AVENUE <br />Line No. Description Quantity Unit Unit Price <br />PPP HIGH STREET FROM 3RD AVENUE TO 17TH AVENUE <br />General <br />mount <br />0380. <br />MOBILIZATION <br />1.00 <br />LUMPSUM <br />$27,000.00 <br />$27,000.00 <br />0390. <br />TEMP. WORK ZONE TRAFFIC CONTROL, COMPLETE <br />1.00 <br />LUMPSUM <br />$21,000.00 <br />$21,000.00 <br />0400. <br />TEMPORARY STRIPING <br />1.00 <br />LUMPSUM <br />$3,900.00 <br />$3,900.00 <br />0410. <br />PORTABLE CHANGEABLE MESSAGE SIGNS <br />2.00 <br />EACH <br />$2,500.00 <br />$5,000.00 <br />0420. <br />FLAGGERS <br />850.00 <br />HOUR <br />$46.00 <br />$39,100.00 <br />0430. <br />RAILROAD FLAGGERS <br />100.00 <br />HOUR <br />$110.00 <br />$11,000.00 <br />0440. <br />CITY PROVIDED SPEC INFO SIGNS <br />4.00 <br />EACH <br />$300.00 <br />$1,200.00 <br />0450. <br />SPECIAL ARRA PROJECT SIGNS <br />66.00 <br />SQFT <br />$20.00 <br />$1,320.00 <br />0460. <br />EROSION CONTROL <br />1.00 <br />LUMPSUM <br />$4,500.00 <br />$4,500.00 <br />0470. <br />ADJUSTING BOXES <br />39.00 <br />EACH <br />$280.00 <br />$10,920.00 <br />0480. <br />MINOR ADJUSTMENT OF MANHOLES <br />41.00 <br />EACH <br />$1,350.00 <br />$55,350.00 <br />0490. <br />MINOR ADJUSTMENT OF MANHOLE - REPLACE RISERS <br />1.00 <br />EACH <br />$700.00 <br />$700.00 <br />0500. <br />EXTRA FOR ADJUST OF MH W/EXIST CONC SURROUND <br />42.00 <br />EACH <br />$10.00 <br />$420.00 <br />0510. <br />REM/REPL FRAME/COVER-ST <br />13.00 <br />EACH <br />$319.01 <br />$4,147.13 <br />0520. <br />REM/REPL FRAME/COVER-WW <br />3.00 <br />EACH <br />$300.00 <br />$900.00 <br />0530. <br />PAVEMENT REMOVAL <br />370.00 <br />SQFT <br />$3.00 <br />$1,110.00 <br />0540. <br />ASPHALT CONCRETE PAVEMENT REPAIR <br />2,200.00 <br />CUYD <br />$46.00 <br />$101,200.00 <br />0550. <br />CONCRETE PAVEMENT REPAIR <br />170.00 <br />CUYD <br />$67.00 <br />$11,390.00 <br />0560. <br />COLD PLANE PVMT REMOVAL, 2" DEEP <br />72,100.00 <br />SQFT <br />$0.28 <br />$20,188.00 <br />0570. <br />COLD PLANE PVMT REMOVAL, 2" TO 4" DEEP <br />26,000.00 <br />SQFT <br />$0.32 <br />$8,320.00 <br />0580. <br />COLD PLANE PVMT REMOVAL, 3" DEEP <br />31,150.00 <br />SQFT <br />$0.27 <br />$8,410.50 <br />0590. <br />COLD PLANE PVMT REMOVAL, 4" DEEP <br />51,000.00 <br />SQFT <br />$0.28 <br />$14,280.00 <br />0600. <br />LEVEL 3, 1/2" DENSE WMAC <br />5,000.00 <br />TON <br />$52.50 <br />$262,500.00 <br />0610. <br />PLAIN CONCRETE PVMT, DOWELED, 8 IN. THICK <br />3,420.00 <br />SQFT <br />$7.00 <br />$23,940.00 <br />0620. <br />STANDARD CONCRETE CURBS <br />116.00 <br />FOOT <br />$19.00 <br />$2,204.00 <br />0630. <br />CONCRETE CURB AND GUTTER <br />112.00 <br />FOOT <br />$33.00 <br />$3,696.00 <br />0640. <br />CONCRETE WALKS, 4" THICK <br />1,680.00 <br />SQFT <br />$11.50 <br />$19,320.00 <br />0650. <br />TRUNCATED DOME TEXTURING-BLACK <br />96.00 <br />SQFT <br />$20.00 <br />$1,920.00 <br />0660. <br />CONCRETE GRINDING <br />10.00 <br />SQFT <br />$25.00 <br />$250.00 <br />0670. <br />PVMT LEGEND, TYPE B: ARROWS <br />23.00 <br />EACH <br />$260.00 <br />$5,980.00 <br />0680. <br />PVMT LEGEND, TYPE B: BICYCLE LANE SYMBOLS <br />18.00 <br />EACH <br />$260.00 <br />$4,680.00 <br />0690. <br />PVMT LEGEND, TYPE B: RR CROSSING MARKINGS <br />2.00 <br />EACH <br />$1,100.00 <br />$2,200.00 <br />0700. <br />PVMT LINE, TYPE B: PARKING TEES <br />110.00 <br />SQFT <br />$25.00 <br />$2,750.00 <br />0710. <br />PVMT LINE, TYPE B <br />1,800.00 <br />SQFT <br />$8.00 <br />$14,400.00 <br />0720. <br />MONO-DIRECTIONAL CRYSTAL TYPE I MARKERS <br />144.00 <br />EACH <br />$4.00 <br />$576.00 <br />0730. <br />BI-DIRECTIONAL YELLOW TYPE I MARKERS <br />30.00 <br />EACH <br />$4.00 <br />$120.00 <br />0740. <br />LOOP DETECTORS INSTALLATION <br />12.00 <br />EACH <br />$650.00 <br />$7,800.00 <br />0750. <br />THERMOPLASTIC, NON-PROFILE, 90 MIL, EXTRUDED <br />1.00 <br />LUMPSUM <br />$13,000.00 <br />$13,000.00 <br />0760. <br />REMOVE AND REPLACE SIGN <br />1.00 <br />EACH <br />$360.00 <br />$360.00 <br />0770. <br />ADJUST JUNCTION BOX <br />3.00 <br />EACH <br />$300.00 <br />$900.00 <br />0780. <br />REMOVE JUNCTION BOX <br />2.00 <br />EACH <br />$350.00 <br />$700.00 <br />0790. <br />JUNCTION BOX, TYPE 2 <br />1.00 <br />EACH <br />$550.00 <br />$550.00 <br />0800. <br />JUNCTION BOX, TYPE 3 <br />1.00 <br />EACH <br />$600.00 <br />$600.00 <br />0810. <br />CONDUIT UNDER HARD SURFACING <br />40.00 <br />FT <br />$60.00 <br />$2,400.00 <br />0820. <br />LOOP FEEDER CABLE <br />200.00 <br />FT <br />$1.50 <br />$300.00 <br />0830. <br />RELOCATE PEDESTRIAN PUSHBUTTON POLE <br />2.00 <br />EACH <br />$1,750.00 <br />$3,500.00 <br />0840. <br />LAWN SEEDING <br />40.00 <br />SQFT <br />$2.25 <br />$90.00 <br />0850. <br />TOPSOIL <br />5.00 <br />CUYD <br />$73.00 <br />$365.00 <br />Total <br />General <br />$726,456.63 <br />Total : PPP <br />HIGH STREET FROM 3RD AVENUE TO 17TH AVENUE <br />$726,456.63 <br />PPP HIGH STREET FROM 3RD AVENUE TO 17TH AVENUE - Other / Direct <br />General <br />0010. <br />Contingency <br />3.5% of Contract <br />$25,425.98 <br />0020. <br />test <br />2% of Contr <br />act <br />$14,529.13 <br />0050. <br />ODOT admin costs <br />1.00 <br />LUMPSUM <br />$10,000.00 <br />$10,000.00 <br />