Page 4 <br />Ran Dates 12/07/2009 ue51:08 <br />City of Eugene <br />Contract <br />Preliminary Progress Payment <br />Paysumt No s 004 <br />Contractor- WHAT CONSTRUCTION CO. <br />Job 93=004.378 <br />Contract Nos 2010-00003 <br />PO 2010100057 <br />Original Contract: $3,438,410.50 <br />Current Amounts $3,438,410.50 <br />Contract Award Date. 01/27/2008 <br />Completion Date: 08/3112010 <br />Assessable: No <br />7 Line Desorintion Last Cbng Ord <br />Unit Price <br />unit Measure <br />Current Contract <br />Quantity <br />Amount <br />Estimated Payment <br />Qmantiiv <br />Amwnt <br />Cumulative Totals <br />Quantity <br />Amount <br />8 CoVlete <br />0466 <br />0470 <br />0480 <br />0490 <br />0500 <br />0510 <br />0520 <br />0530_ <br />0540 <br />DRILLED SHAFT CONCRETE <br />DRILLED SHAFT RBINFORCBMEMT <br />CSL TEST ACCESS TUBES <br />DRILLED SBAFT EXCAVATION, 48 I <br />DRILLED SHAPT EXCAVATION 96 I <br />REINFORCEMENT <br />DECK CONCRETE, CLASS HPC5000 <br />GMUMAL STRUCTURAL CONCRETE, C <br />GSNBRAL STRUCTURAL CONCRETE, c <br />$1001,000.00 <br />$66,000.00 <br />510.00 <br />$200.00 <br />$400.00 <br />$150,000.00 <br />$715,000.00 <br />$S0.000.00 <br />$70,00.0.00 <br />LUMPSUM <br />Lum'SUN <br />_POOT <br />FT <br />PT <br />LUMPSUM <br />LUMPSUM <br />LUMPSUM <br />LUMPSUM <br />1.000 <br />1.000 <br />2,400.000 <br />511.000 <br />4S.000 <br />1.000 <br />1.000 <br />1.000 <br />1:000 <br />$100,000.00 <br />60 000.00 <br />$24,000.00 <br />$102,200.00 <br />$18,000.00 <br />$150,000.00 <br />$715,000.00 <br />$50,000.00 <br />$70,000.00 <br />D.306 <br />0.306 <br />843.600 <br />211.000 <br />0.000 <br />0.096 <br />0.000 <br />0.000 <br />0.780 <br />$30,600.00 <br />38,360.00 <br />$8,436.00 <br />$42,200.00 <br />12,00, <br />$14,400.00 <br />$0.00 <br />$0.00 <br />$54,600.00 <br />1.000 <br />2.000 <br />2,403.600 <br />511.000 <br />4S.000 <br />0.108 <br />0.000 <br />0.000 <br />0.890 <br />$300,000.00 <br />60 000.00 <br />$24,036.00 <br />$].02,200.00 <br />$18,000.00 <br />$16,140 00 <br />$0 00 <br />$0.00 <br />$62,300 00 <br />100.00 <br />100.00 <br />100.00 <br />100.00 <br />100.00 <br />11.00 <br />M 0.00 <br />0.00 <br />89.00 <br />0550 <br />PRECAST CONCRETE DECK PANELS <br />$12,000.00 <br />EACH <br />15.000 <br />$180,000.00 <br />0.000- <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0560 <br />PRECAST CONCRETE PYLON LEGS <br />$130,000.00 <br />EACH <br />2.000 <br />$260,000.00 <br />0.000 <br />$0.00 <br />_ 01000 <br />$0.00 <br />0.00 <br />0570 <br />POST-THNSIONING <br />$80,000.00 <br />LUMPSUM <br />1.000 <br />$80;000.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0580 <br />PYLON LEG STRUCTURAL STEEL <br />$38,000.00 <br />LUMPSUM <br />1.000 <br />$38,000.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0590 <br />EXPANSION JOINT HANGER SYSTEMS <br />$8,000-00 <br />LUMPSUM <br />1.000 <br />$8,000.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0600 <br />CABLE STAYS <br />$250,000.00 <br />LUMPSUM <br />11000 <br />$250,000.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0610 <br />BEARING DBVICES, BENT 1 <br />$100.00 <br />EACH <br />2.000 <br />$200.00 <br />0.000 <br />$0.00 <br />0.000 <br />40.00 <br />0.00 <br />0620 <br />BEAP-MG DEVICES BENT 18 <br />2100 00 <br />EACH <br />2 000 <br />$200,00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.0-0-- <br />0630 <br />1 1/4 IN. ELECTRICAL CONDUIT <br />$12.00 <br />FOOT <br />1,800.000 <br />$21,600.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0 00 <br />0640 <br />DOOM JOINT SEALS <br />$1,000-00 <br />LUMPSUM <br />1.000 <br />51,000.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0650 <br />PREFORMED ELASTOMERIC STRIP BE <br />$16,000.00 <br />LUMPSUM <br />1.000 <br />$16,000.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0660 <br />PEDESTRIAN BRIDGE RAIL <br />$160,000.00 <br />LUMPSUM <br />1.000 <br />$160,000.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0670 <br />RETAINING WALL, MSE, NO. 1 <br />$50.00 <br />SOFT <br />201.000 <br />$10,650.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0680 <br />RETAINING WALL MSE NO 2 <br />$S0.00 <br />SOFT <br />1,956.000 <br />$97,800.00 <br />0.0()0 <br />$0.00 <br />0.000 <br />$0.00 <br />0 00 <br />0690 <br />MSS WALL COPING, TYPE 1 <br />$130.00 <br />FOOT <br />283':000 <br />_ $36,790.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0 00 <br />0.00 <br />