Run Date: 01/05/2010 10:14:10 <br />Contractor: BABB CONSTRUCTION <br />Job 93-004546 <br />Contract No: 2009-00030 <br />PO 2010100033 <br />Assessable: Yes <br />City of Eugene <br />Contract Preliminary Progress Payment <br />Payment No : 006 <br />Original Contract: $2,120,407.20 <br />Current Amount: $2,152,119.69 <br />Contract Award Date: 07/02/2009 <br />Completion Date: 10/20/2010 <br />Page 6 <br />Current Contract <br />Estimated <br />Payment <br />Cumulative <br />Totals <br />% Complete <br />Line <br />Description Last Chng Ord <br />Unit Price <br />Unit Measure <br />Quantity <br />Amount <br />Quantity <br />Amount <br />Quantity <br />Amount <br />0720 <br />TREE REMOVAL, 5" - 24" <br />$400.00 <br />EACH <br />18.000 <br />$7,200.00 <br />15.000 <br />$6,000.00 <br />15.000 <br />$6,000.00 <br />83.00 <br />0730 <br />TREE REMOVAL, 25" TO 36" <br />$2,000.00 <br />EACH <br />1.000 <br />$2,000.00 <br />6.000 <br />$12,000.00 <br />6.000 <br />$12,000.00 <br />600.00 <br />0740 <br />TREE REMOVAL, OVER 37" <br />$3,000.00 <br />EACH <br />1.000 <br />$3,000.00 <br />0.000 <br />$0.00 <br />0,000 <br />$0.00 <br />0.00 <br />0750 <br />TREE REMOVAL DURING EXCAVATION <br />$400.00 <br />EACH <br />12.000 <br />$4,800.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0760 <br />HABITAT TREE <br />$400.00 <br />EACH <br />6.000 <br />$2,400.00 <br />2.000 <br />$800.00 <br />2.000 <br />$800.00 <br />33.00 <br />0770 <br />TEMPORARY TYPE ORANGE PLASTIC <br />$1.50 <br />FOOT <br />9,549.000 <br />$14,323.50 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0780 <br />GENERAL EXCAVATION <br />$12.30 <br />CUYD <br />13,240.000 <br />$162,852.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0790 <br />TEMPORARY TYPE ORANGE PLASTIC <br />$1.50 <br />FOOT <br />1,233.000 <br />$1,849.50 <br />0.000 <br />$0.00 <br />738.000 <br />$1,107.00 <br />60.00 <br />0800 <br />SUBGRADE GEOTEXTILE <br />$0.80 <br />SQYD <br />27,630.000 <br />$22,104.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0810 <br />REMOVE 12" PIPE <br />$40.00 <br />FOOT <br />55.000 <br />$2,200.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0820 <br />4" STORMWATER PERF PIPE (WRAPP <br />$2.00 <br />FOOT <br />1,307.000 <br />$2,614.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0830 <br />10 INCH PVC STORM PIPE <br />$27.00 <br />FOOT <br />741.000 <br />$20,007.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0840 <br />12 INCH PVC STORM PIPE <br />$33.50 <br />FOOT <br />5,900.000 <br />$197,650.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0850 <br />15 INCH PVC STORM PIPE <br />$36.00 <br />FOOT <br />345.000 <br />$12,420.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0860 <br />15 INCH REINFORCED CONCRETE PI <br />$48.00 <br />FOOT <br />24.000 <br />$1,152.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0870 <br />VIDEO INSPECTION <br />$1.00 <br />FOOT <br />7,010.000 <br />$7,010.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0880 <br />CONCRETE STORM DRAIN MANHOLES <br />$2,200.00 <br />EACH <br />49.000 <br />$107,800.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0890 <br />CONCRETE INLETS, TYPE 4A <br />$1,282.80 <br />EACH <br />5.000 <br />$6,414.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0 00 <br />0900 <br />DITCH INLETS, TYPE D <br />$876.70 <br />EACH <br />33.000 <br />$28,931.10 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0910 <br />SLOPED OUTFALL PROTECTION <br />$400.00 <br />EACH <br />2.000 <br />$800.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0 00 <br />0.00 <br />0920 <br />MINOR ADJUSTMENT OF MANHOLES <br />$450.00 <br />EACH <br />34.000 <br />$15,300.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0 00 <br />0930 <br />ADJUSTMENT OF WATER VALVES <br />$150.00 <br />EACH <br />18.000 <br />$2,700.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0940 <br />1-1/2" - 0 AGGREGATE BASE <br />$15.55 <br />TON <br />7,744.000 <br />$120,419.20 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0950 <br />3/4" - 0 AGGREGATE BASE <br />$26.60 <br />TON <br />612.000 <br />$16,279.20 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />