ALTERNATE BIDS <br />The Undersigned proposes to Deduct or Add the Base Bid indicated above the items of work relating to the following <br />Alternates as described in the Project Manual, Section 01230. <br />ALTERNATE NO. 1: Delete Track at Jefferson ATA <br />Delete the track and associated paving and earthwork. See A102 for the site configuration applicable to this alternate. <br />1 N f4-T <br />D-0 000 <br />(Figures) <br />1 work on or before dates <br />N (words) ' ' <br />The undersigned agrees, if awarded the Contract, to substantially complete all Alternate No. <br />specified in Section 01100. <br />ALTERNATE NO. 2: Replace CMU Walls at Enclosures with Chain Link <br />Delete the CMU walls and footings and replace with 6'-0" chain link fence and 24" wide mowstrip. Match the fence <br />finish at specified for the individual site. Price to be for one site with the understanding that the Owner may choose to <br />exercise the alternate for both sites by multiplying by two. <br />t ` x' <br />Bid: l e c ~~a t- A .k-•U L_ k L VL 6l~ Ccs $ ~CpO <br />(Words)' I (Fi ) <br />The undersigned agrees, if awarded the Contract, to substantially complete all Alternate No. 2 work on or before dates <br />specified in Section 01100. <br />ALTERNATE NO. 3: Delete the perf pipe trench. drain at the south side of the existing Spencer Butte track. <br />Delete the perf pipe trench drain as shown on C202 and C/C302. <br />Bid : tl I-f-c y' 1 +1 0$ tlci Z /ctc- <br />% (Words) ' (Figures <br />The undersigned agrees, if awarded the Contract, to substantially complete all Alternate No. 3 work on or before dates <br />specified in Section 01100. <br />ALTERNATE NO. 4.- Delete track surfacing from the east end "D " at Jefi erson ATA <br />Bid: / -7 -l <br />(Words) ffiprefi) <br />The undersigned agrees, if awarded the Contract, to substantially complete all Alternate No. 3 work on or before dates <br />specified in Section 01100. <br />ALTERNATE NO. S: Add the paved path, curbs, and associated drainage at the east side of Spencer Butte Middle <br />School <br />Bid: k c ~C~yt, (9d S ,~LI,~C't~ <br />(Words) (Figures) <br />The undersigned agrees, if awarded the Contract, to substantially complete all Alternate No. 3 work on or before dates <br />specified in Section 01100. <br />It is understood that the Base Bid may be adjusted for any alternates in determining the amount of the Contract. Any <br />or all of such Alternates may be accepted or reinstated by the Owner at any time within 60 days from the date of the <br />Contract Award by the Owner, at the respective amounts named herein. <br />BID FORM (Addendum I - 3126108) DOCUMENT 00300 - 2 <br />