December 8, 2009 <br />Mark Schoening, City Engineer <br />City of Eugene <br />244 E Broadway <br />Eugene, Oregon 97401 <br />RE: Contract No. 2010-00011, Delta Ponds Riparian Bench Construction <br />Dear Mr. Schoening, <br />In accordance with ORS 279C.560 (4), Delta Construction Co. requests that any <br />retainage withheld from the above mentioned contracts be deposited in interest bearing <br />accounts. Said interest to accrue to contractor at project completion. <br />Sincerely, <br />sl%~Cfl~ 0 > <br />Steven D Crippen <br />Vice President <br />c,~ ~pp9 <br />