Run Date: 12/10/2009 08:55:12 <br />Contractor: BABB CONSTRUCTION <br />Job 93-003923 <br />Contract No: 2009-00027 <br />PO 2009100421 <br />Assessable: Yes <br />City of Eugene <br />Contract Preliminary Progress Payment <br />Payment No : 006 <br />Original Contract: $916,940.18 <br />Current Amount: $922,213.01 <br />Contract Award Date: 06/15/2009 <br />Completion Date: 10/30/2009 <br />Current Contract <br />Description Last Chng Ord Unit Price. Unit Measure Quantity <br />Estimated Payment Cumulative Totals <br />Amount Quantity Amount Quantity <br />Page 3 <br />g Complete <br />0220 <br />6 INCH WASTEWATER PIPE, 0-5' D <br />$34.00 <br />FOOT <br />444.000 <br />$15,096.00 <br />0.000 <br />$0.00 <br />382.300 <br />$12,998.20 <br />86.00 <br />0230 <br />8 INCH WASTEWATER PIPE, 5-8' D <br />$35.00 <br />FOOT <br />988.000 <br />$34,580.00 <br />102.100 <br />$3,573.50 <br />1,161.300 <br />$40,645.50 <br />118.00 <br />0240 <br />10 INCH STORM DRAIN PIPE, 0-5' <br />$28.50 <br />FOOT <br />237.000 <br />$6,754.50 <br />0.000 <br />$0.00 <br />234.200 <br />$6,674.70 <br />99.00 <br />0250 <br />12 INCH STORM DRAIN PIPE 0-5' <br />$30.50 <br />FOOT <br />64.000 <br />$1,952.00 <br />0.000 <br />$0.00 <br />102.400 <br />$3,123.20 <br />160.D0 <br />0260 <br />12 INCH STORM DRAIN PIPE, 5-8' <br />$30.50 <br />FOOT <br />577.000 <br />$17,598.50 <br />0.000 <br />$0.00 <br />495.400 <br />$15,109.70 <br />86.00 <br />0270 <br />15 INCH STORM DRAIN PIPE, 0-5' <br />$31.25 <br />FOOT <br />206.000 <br />$6,437.50 <br />0.000 <br />$0.00 <br />206.000 <br />$6,437.50 <br />100.00 <br />0280 <br />18 INCH STORM DRAIN PIPE, 5-8' <br />$37.50 <br />FOOT <br />455.000 <br />$17,062.50 <br />0.000 <br />$0.00 <br />260.500 <br />$9,768.75 <br />57.00 <br />0290 <br />24 INCH STORM DRAIN PIPE, 5-8' <br />$49.50 <br />FOOT <br />119.000 <br />$5,890.50 <br />0.000 <br />$0.00 <br />358.900 <br />$17,765.55 <br />302.00 <br />0300 <br />VIDEO INSPECTION <br />$1.00 <br />FOOT <br />2,833.000 <br />$2,833.00 <br />0.000 <br />$0.00 <br />2,452.500 <br />$2,452.50 <br />87.00 <br />0310 <br />MODIFIED DITCH INLET, TYPE D <br />$937.36 <br />EACH <br />11.000 <br />$10,310.96 <br />0.000 <br />$0.00 <br />11.000 <br />$10,310.96 <br />100.00 <br />0320 <br />CONCRETE SANITARY WASTEWATER M <br />$2,400.00 <br />EACH <br />8.000 <br />$19,200.00 <br />0.000 <br />$0.00 <br />8.000 <br />$19,200.00 <br />100.00 <br />0330 <br />CONCRETE STORM DRAIN MANHOLES <br />$2,300.00 <br />EACH <br />11.000 <br />$25,300.00 <br />0.000 <br />$0.00 <br />10.000 <br />$23,000.00 <br />91.00 <br />0340 <br />MINOR ADJUSTMENT OF MANHOLES <br />$400.00 <br />EACH <br />1.000 <br />$400.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0350 <br />MAJOR ADJUSTMENT OF MANHOLES <br />$1,000.00 <br />EACH <br />1.000 <br />$1,000.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0360 <br />3/4"-0 AGGREGATE BASE <br />$12.54 <br />TON <br />791.000 <br />$9,919.14 <br />0.000 <br />$0.00 <br />412.230 <br />$5,169.36 <br />52.00 <br />0370 <br />2" - 0 AGGREGATE BASE <br />$12.54 <br />TON <br />4,442.000 <br />$55,702.68 <br />0.000 <br />$0.00 <br />6,605.890 <br />$82,837.86 <br />149.00 <br />0380 <br />LEVEL 2, 1/2" DENSE HMAC <br />$62.85 <br />TON <br />30.000 <br />$1,885.50 <br />0.000 <br />$0.00 <br />33.640 <br />$2,114.27 <br />112.00 <br />0381 <br />ADJ LEVEL 2, 1/2" DENSE HMAC ( <br />005 <br />($2.36) <br />TON <br />33.640 <br />($79.39) <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0382 <br />ADJ LEVEL 2, 1/2" DENSE HMAC-0 <br />007 <br />($2.04) <br />TON <br />33.640 <br />($68.63) <br />33.640 <br />($68.63) <br />33.640 <br />($68.63) <br />100.00 <br />0390 <br />LEVEL 3, 1/2" DENSE HMAC <br />$48.50 <br />TON <br />3,835.000 <br />$185,997.50 <br />0.000 <br />$0.00 <br />3,843.570 <br />$186,413.15 M <br />100 00 <br />0391 <br />ADJ TO LEVEL 3, 1/2 DENSE HMAC <br />004 <br />($2.36) <br />TON <br />1,845.660 <br />($4,355.76) <br />924.230 <br />($2,181.18) <br />2,769.890 <br />($6,536.94) <br />150.00 <br />0392 <br />ADJ LEVEL 3, 1/2" DENSE HMAC-0 <br />007 <br />($2.04) <br />TON <br />1,073.680 <br />($2,190.31) <br />1,073.680 <br />($2,190.31) <br />1,073.680 <br />($2,190.31) <br />100.00 <br />0400 <br />EXTRA FOR DRIVEWAYS <br />$1.77 <br />SQFT <br />2,056.000 <br />$3,639.12 <br />0.000 <br />$0.00 <br />1,794.900 <br />$3,176.97 <br />87,00 <br />0410 <br />REVERSE CURB AND GUTTER <br />$8.60 <br />FOOT <br />1,685.000 <br />$14,491.00 <br />0.000 <br />$0.00 <br />1,796.000 <br />$15,445.60 <br />107.00 <br />Amount <br />