Run Date: 12/09/2009 10:26:54 <br />Contractor: <br />Job <br />Contract No: <br />PO <br />Assessable: <br />Line Desc <br />EGGE SAND & GRAVEL <br />93-004585 <br />2009-00020 <br />2010100011 <br />No <br />!ription Last <br />City of Eugene <br />Contract Preliminary Progress Payment <br />Payment No : 006 Final Pay <br />Original Contract: $930,287.95 <br />Current Amount: $986,018.66 <br />Contract Award Date: 05/05/2009 <br />Completion Date: 08/02/2009 <br />Current Contract Estimated Payment Cumulative Totals <br />Unit Price Unit Measure Quantity Amount Quantity Amount Quantity <br />Amount <br />Page 3 <br />-W Complete <br />0220 <br />CONCRETE 5' WIDE CURB AND GUTT <br />$34.00 <br />FOOT <br />300.000 <br />$10,200.00 <br />0.000 <br />$0.00 <br />369.000 <br />$12,546.00 <br />123.00 <br />0230 <br />STANDARD CONCRETE CURBS e1 <br />$10.00 <br />FOOT <br />2,420.000 <br />$24,200.00 <br />0.000 <br />$0.00 <br />2,128.200 <br />$21,282.00 <br />88.00 <br />0240 <br />MOUNTABLE CONCRETE CURBSC1 <br />$10.00 <br />FOOT <br />795.000 <br />$7,950.00 <br />0.000 <br />$0.00 <br />739.000 <br />$7,390.00 <br />93.00 <br />0250 <br />CONCRETE WALKS - 4" a <br />$4.00 <br />SQFT <br />4,560.000 <br />$18,240.00 <br />0.000 <br />$0.00 <br />4,360.860 <br />$17,443.44 <br />96.00 <br />0260 <br />CONCRETE 6" C-1 <br />$4.50 <br />SQFT <br />3,920.000 <br />$17,640.00 <br />0.000 <br />$0.00 <br />3,923.130 <br />$17,654.09 <br />100 00 <br />0270 <br />CONCRETE DRIVEWAYS - 711C, <br />$5.50 <br />SQFT <br />600.000 <br />$3,300.00 <br />0.000 <br />$0.00 <br />1,472.430 <br />$8,098.37 <br />245.00 <br />0280 <br />GRIND CONCRETE WALK <br />$7.00 <br />SQFT <br />100.000 <br />$700.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0290 <br />TRUNCATED DOME TEXTURING C1 <br />$22.00 <br />SQFT <br />190.000 <br />$4,180.00 <br />0.000 <br />$0.00 <br />148.000 <br />$3,256.00 <br />78 00 <br />0300 <br />RETAINING WALL, CONVENTIONAL S <br />$20.00 <br />SQFT <br />135.000 <br />$2,700.00 <br />0.000 <br />$0 00 <br />0.000 <br />$0.00 <br />0.00 <br />0310 <br />STRIPE REMOVAL <br />$4.00 <br />FOOT <br />400.000 <br />$1,600.00 <br />0.000 <br />$0.00 <br />419.000 <br />$1,676.00 <br />105.00 <br />0320 <br />PVMT LEGEND REMOVAL <br />$8.00 <br />SQFT <br />250.000 <br />$2,000.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0330 <br />TEMPORARY STRIPING <br />$3,500.00 <br />LUMPSUM <br />1.000 <br />$3,500.00 <br />0.000 <br />$0.00 <br />1.000 <br />$3,500.00 <br />100.00 <br />0340 <br />TEMPORARY STRIPING TAPE <br />$1.60 <br />FT <br />400.000 <br />$640.00 <br />0.000 <br />$0.00 <br />266.000 <br />$425.60 <br />67.00 <br />0350 <br />THERMOPLASTIC, NON-PROFILE, 90 <br />$26,250.00 <br />LUMPSUM <br />1.000 <br />$26,250.00 <br />0.000 <br />$0.00 <br />0.950 <br />$24,937.50 <br />95.00 <br />0360 <br />PVMT LEGEND, TYPE A2: ARROWS <br />$3,480.00 <br />LUMPSUM <br />1.000 <br />$3,480.00 <br />0.000 <br />$0.00 <br />1.000 <br />$3,480.00 <br />100.00 <br />0370 <br />PVMT LEGEND, TYPE A2: BICYCLE <br />$490.00 <br />LUMPSUM <br />1.000 <br />$490.00 <br />0.000 <br />$0.00 <br />1.000 <br />$490.00 <br />100.00 <br />0380 <br />WOOD SIGN POSTS <br />$100.00 <br />EACH <br />9 000 <br />$900.00 <br />0.000 <br />$0.00 <br />6.000 <br />$600.00 <br />67.00 <br />0390 <br />TYPE W1 SIGNS IN PLACE <br />$63.00 <br />EACH <br />18.000 <br />$1,134.00 <br />0.000 <br />$0.00 <br />30.000 <br />$1,890.00 <br />167.00 <br />0400 <br />LOOP DETECTORS INSTALLATION <br />$19,000.00 <br />LUMPSUM <br />1.000 <br />$19,000.00 <br />0.000 <br />$0.00 <br />1.000 <br />$19,000.00 <br />100.00 <br />0401 <br />LOOP DETECTORS INSTALLATION <br />001 <br />$1,065.00 <br />LUMPSUM <br />1.000 <br />$1,065.00 <br />0.000 <br />$0.00 <br />1.000 <br />$1,065.00 <br />100.00 <br />0410 <br />AUDIBLE PEDESTRAIN DEVICE-COMP <br />$10,000.00 <br />LUMPSUM <br />1.000 <br />$10,000.00 <br />0.000 <br />$0.00 <br />1.000 <br />$10,000.00 <br />100 00 <br />0411 <br />AUDIBLE PEDESTRIAN DEVICE COMP <br />001 <br />$2,477.00 <br />LUMPSUM <br />1.000 <br />$2,477.00 <br />0.000 <br />$0.00 <br />1.000 <br />$2,477.00 <br />100 00 <br />0420 <br />STREET LIGHTS, COMPLETE <br />C~ <br />$24,200.00 <br />LUMPSUM <br />1.000 <br />$24,200.00 <br />0 000 <br />$0 00 <br />1.000 <br />$24,200.00 <br />100.00 <br />0421 <br />STREET LIGHTS COMPLETE <br />001 <br />$13,832.33 <br />LUMPSUM <br />1.000 <br />$13,832.33 <br />0.000 <br />$0.00 <br />1.000 <br />$13,832.33 <br />100 00 <br />