New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4580 ODOT 2010-00222
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN4580 ODOT 2010-00222
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2014 2:35:44 PM
Creation date
12/9/2009 1:48:05 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
Yes
External_View
No
GJN
004580
004614
004616
004618
GL_Project_Number
995324
995824
995844
995864
COE_Contract_Number
2010-00222
Retention_Destruction_Date
12/10/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Eugene / State of Oregon - Dept of Transportation <br />Agreement No. 25104 <br />direction or approval of its governing body, commission, board, officers, members or <br />representatives, and to legally bind City. <br />16. City shall, at its own expense, maintain and operate all structures and <br />appurtenances installed on and along Garfield Street and West 7th Place as a result <br />of this Project. <br />17. City shall maintain all sidewalks and landscaping located adjacent to and behind the <br />curb line on West 7th Avenue within the limits of this Project upon its completion and <br />throughout the assumed facility life of the Project at a minimum level that is <br />consistent with normal depreciation and service demand. State and City agree that <br />the assumed facility life of this Project is defined as twenty (20) calendar years. <br />18. City's Project manager for this Project is Matt Rodrigues, Project Manager, City of <br />Eugene Public Works Engineering, 99 East Broadway, Suite 400, Eugene, Oregon, <br />97401, phone (541) 682-6036, or assigned designee upon individual's absence. <br />State's Project manager shall be notified in writing of any contact information <br />changes during the term of this Agreement. <br />STATE OBLIGATIONS <br />1. State's Area 5 Office and Region 2 Technical Center Office staff shall prepare <br />design plans in cooperation with City. State shall review and must concur in the <br />plans prepared before the Project is advertised for a construction contract or before <br />construction begins if City forces perform the work. State retains the right to adjust <br />the Project's scope of work to stay within the allocated funding for Project. <br />2. In consideration for the services performed, State agrees to pay City within forty-five <br />(45) days of receipt by State of the Project invoice a maximum amount of $20,000, <br />unless an increase is so authorized by State by amendment to this Agreement. Said <br />maximum amount shall include reimbursement for all expenses. Travel expenses <br />shall not be reimbursed. State's Area 5 Office shall process all invoices submitted by <br />City. <br />3. State grants authority to City to enter upon State right of way for the construction <br />and maintenance of this Project. <br />4. State certifies, at the time this Agreement is executed, that sufficient funds are <br />available and authorized for expenditure to finance costs of this Agreement within <br />State's current appropriation or limitation of the current biennial budget. <br />5. State will conduct the final technical inspection of the completed Project. <br />Page 6 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.