New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4514 Final Warranty
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN4514 Final Warranty
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2011 11:41:40 PM
Creation date
12/9/2009 11:04:38 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004514
GL_Project_Number
985055
COE_Contract_Number
2008-00018
Retention_Destruction_Date
12/7/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Final Acceptance Public Works <br />Completion of Warranty Period Engineering <br />99 East Broadway, Ste 400 <br />Eugene, OR 97401 <br />(541)682-5291 <br />(541) 682-8410 <br />To: C & M Construction, Inc. Date: December 7, 2009 <br />Attn: Steve Sallee <br />21287 S. W. Oregon St, From: Karl Kreutzer (541) 682-8466 <br />Sherwood, OR 97140 <br />Project: Legacy Wastewater Interceptor - Phase II From Royal Avenue to Terry Street <br />Contract Number: 2008-18 <br />Job Number: 4514 <br />A warranty inspection has been made on this project in accordance with Section 00150 of the <br />City Standard Specifications and Standard Drawings. <br />No defects were noted and/or were corrected the project is hereby accepted by the City for <br />permanent maintenance. <br />FOR PRIVATELY ENGINEERED PROJECTS ONLY- <br />Engineer. <br />Address: <br />Owner. <br />Address <br />ENG 1122 Contractor File Engineer Owner Surety ( 'PW Admi Construction Manager\W Revised 4104 <br />Finance/Accts Receivable for assessable projects or City Re for nonassessable projects <br />
The URL can be used to link to this page
Your browser does not support the video tag.