Notification of Commencement and <br />Completion Dates for Contract Projects <br />Public Works <br />Engineering <br />City of Eugene <br />99 E. Broadway, #400 <br />Eugene, OR.97401 <br />(541) 682-5291 <br />DATE <br />CONTRACT NO. <br />1211/2009 <br />2010-00006 <br />PROJECT NAME <br />JOB NO. <br />Walnut Grove Park - Phase 2 <br />4645 <br />CONTRACTOR <br />FEDERAL AID PROJECT NO. <br />2G Construction <br />INSPECTOR <br />1 <br />PHONE NUMBER <br />DATE OF AWARD <br />Adam Steffen <br />682-5040 <br />Sentember 14.2009 <br />FIRST NOTIFICATION <br />September 14,2009 IS THE DATE ON WHICH THE CONTRACT WORK BEGAN. <br />SECOND NOTIFICATION <br />SPECIFIED COMPLETION DATE (S) (FROM SECT. 00180.50) DAYS CHARGED <br />BEYOND SPECIFIED <br />COMPLETION <br />September 25, 2009 0 <br />October 16, 2009 0 <br />ALL CLAIMS FOR ADDITIONAL COMPENSATION MUST BE SUBMITTED BY. October 31, 2009 <br />(SEE SUBSECTION 00199.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br />September 25, 2009 <br />October 12, 2009 <br />Inspector Signature <br />THIRD NOTIFICATION <br />Notice of Completion. Begin Warranty Period. <br />November 30, 2009 IS THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND <br />PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br />REQUIRED UNDER-THE CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. <br />IN ACCORDANCE WITH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT #1, ALL WORK IS GUARANTEED BY THE <br />CONTRACTOR FOR ONE YEAR FOLLOWING THE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. MANUFACTURE WARRANTIES <br />REMAIN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN THE REQUIRED ONE YEAR. <br />THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN WORK ]HAT BECOME EVIDENT <br />WITHIN THE ONE-YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE WITHIN THE ONE-YEAR PERIOD WILL BE <br />REQUIRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE REPAIR. <br />For Privately Engineered Projects Only <br />Engineer: <br />Address: <br />Owner: <br />Address: <br />DISTRIBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION: ,i <br />Contractor Engineer Owner Construction Manager 4 File Ginger Perales, PWM <br />ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION: <br />POS Maintenance-Planning Surety PW Administration PIC Engineering PWE As Construct Monitor MADD Supervisor Inspector <br />Inspector Signature <br />DATE (S) THE WORK WAS SUBSTANTIALLY <br />COMPLETED & THE TIME CHARGES STOPPED. <br />Q:XPROJECTS\PROJ-5\4645 Walnut Grove Park -Phase 2\Correspondence\Contractorsl4645-First.Second Third. Notification #3.doc March 2009 tAf <br />