Final Acceptance <br />Completion of Warranty Period <br />Public Works <br />Engineering <br />99 East Broadway, Ste 400 <br />Eugene, OR 97401 <br />(541) 682-5291 <br />(541) 682-8410 <br />To: Kipco, Inc. <br />Attn: Kevin Knode <br />90465 Woodruff St. <br />Eugene, OR 97402 <br />Project: Rosewood Meadows <br />Contract Number 2008-518 <br />Date: December 1, 2009 <br />From: Karl Kreuter (541) 682-8466 <br />Job Number 4522 <br />A warranty inspection has been made on this project in accordance with Section 00150 of the <br />City Standard Specifications and Standard Drawings. <br />No defects were noted and/or were corrected the :project is hereby accepted by the City for <br />permanent maintenance. <br />FOR PRIVATELY ENGINEERED PROJECTS ONLY <br />Engineer. Branch Engineering, Inc. <br />Address: 310 Fifth Street <br />Springfield,. Oregon 97477 <br />Owner. Chris Houser <br />Address: P.O. Box 24906 <br />Eugene, Oregon 97402 <br />Q:\PROJECTS\PROJ-2\4522\Correspondence\Contractors\4522-20091201Fina1 Acceptance Completion of Warranty PeriodKBK.doc <br />ENG 1122 Contractor File Engineer Owner Surety PW Admin Construction Manager Revised 4104 <br />Finance/Acxts Receivable for assessable projects or City Recorders Office for nonassessable projects 6 <br />1A <br />