Amazon Enhancements Chambers to West (905246) 09-10 <br />Item Direct cost Cost Unit <br />Engineering <br />Permitting <br />Staff Support <br />Bid / Does / Warnty <br />Mobilization <br />Traffic Control <br />Erosion Control <br />Force Account #1 <br />Force Account #2 <br />Boulders <br />Cobble <br />rock fractured <br />excavation <br />Fabric Coir <br />Const. Total <br />Project Total <br />Engineering persons rate time total <br />2 public meeting <br />5 <br />100 <br />8 <br />5 staff meetings <br />4 <br />90 <br />10 <br />3 Site visits <br />2 <br />100 <br />9 <br />Survey <br />2 <br />100 <br />80 <br />Drafting setup <br />1 <br />100 <br />1 <br />PM Design <br />1 <br />104 <br />24 <br />Cad Design <br />2 <br />102 <br />40 <br />Cad draftin <br />2 <br />100 <br />24 <br />Erosion <br />1 <br />100 <br />8 <br />POS <br />1 <br />100 <br />8 <br />Inspection <br />1.5 <br />100 <br />200 <br />PM <br />1 <br />104 <br />100 <br />contingency <br />Total <br />$4,000.00 <br />$3,600.00 <br />$1,800.00 <br />$16,000.00 <br />$100.00 <br />$2,496.00 <br />$8,160.00 <br />$4,800.00 <br />$800.00 <br />$800.00 <br />$42,556.00 <br />$1.30 <br />$55,322.80 <br />Sub total <br />$55,000.00 <br />$55,000: <br />